[EventId:202406251355_confirmed] Prices for interval 25-Jun-2024 13:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1355 hrs on 25 June 2024
PRICES ARE NOW CONFIRMED for trading interval 25-Jun-2024 13:55.
In accordance with Market Notice 117141 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202406251350_confirmed] Prices for interval 25-Jun-2024 13:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1355 hrs on 25 June 2024
PRICES ARE NOW CONFIRMED for trading interval 25-Jun-2024 13:50.
In accordance with Market Notice 117140 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202406251345_confirmed] Prices for interval 25-Jun-2024 13:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1355 hrs on 25 June 2024
PRICES ARE NOW CONFIRMED for trading interval 25-Jun-2024 13:45.
In accordance with Market Notice 117139 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202406251340_confirmed] Prices for interval 25-Jun-2024 13:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1355 hrs on 25 June 2024
PRICES ARE NOW CONFIRMED for trading interval 25-Jun-2024 13:40.
In accordance with Market Notice 117138 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202406251335_confirmed] Prices for interval 25-Jun-2024 13:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1355 hrs on 25 June 2024
PRICES ARE NOW CONFIRMED for trading interval 25-Jun-2024 13:35.
In accordance with Market Notice 117137 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Non-credible contingency event - NSW region - 25/06/2024
Non-credible contingency event - NSW region - 25/06/2024
At 0901 hrs the Sydney West No.1 330 kV SVC tripped during switching for planned outage of Sydney West No.4 330/132 kV transformer.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 24/06/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 117098 is cancelled at 1430 hrs 23/06/2024.
No LOR condition is currently forecast in the STPASA period.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 24/06/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 117094 has been updated at 1430 hrs 22/06/2024 to the following:
[1.] From 0630 hrs 24/06/2024 to 0930 hrs 24/06/2024.
The forecast capacity reserve requirement is 1703 MW.
The minimum capacity reserve available is 1430 MW.
[2.] From 1600 hrs 24/06/2024 to 2200 hrs 24/06/2024.
The forecast capacity reserve requirement is 1750 MW.
The minimum capacity reserve available is 1417 MW.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 24/06/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
1. From 0700 hrs to 0830 hrs 24/06/2024.
The forecast capacity reserve requirement is 1750 MW.
The minimum capacity reserve available is 1705 MW.
2. From 1630 hrs to 1700 hrs 24/06/2024.
The forecast capacity reserve requirement is 1750 MW.
The minimum capacity reserve available is 1707 MW.
3. From 1730 hrs to 1930 hrs 24/06/2024.
The forecast capacity reserve requirement is 1750 MW.
The minimum capacity reserve available is 1702 MW.
AEMO Operations