Network Augmentation Commissioned - QLD Region - 01/06/2024
Network Augmentation Commissioned - QLD Region - 01/06/2024
H90 Tully South 275 kV Switching Station has been cut into the existing Ross - Woree No.8905 275 kV line to form the following circuits:
H13 Ross - H90 Tully South No.8905/1 275 kV line
H90 Tully South - H39 Woree No.8905/2 275 kV line
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 20/05/2024
Cancellation of Actual (LOR1) condition in the NSW region - 20/05/2024
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.116730 is cancelled at 1910 hrs 20/05/2024.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 20/05/2024
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 20/05/2024
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1700 hrs.
The Actual LOR1 condition is forecast to exist until 1930 hrs
The capacity reserve requirement is 1630 MW
The minimum capacity reserve available is 1028 MW
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 22/05/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 116720 is cancelled at 1200 hrs 20/05/2024.
No LOR2 condition is currently forecast in the STPASA period.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 22/05/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
1. From 0700 hrs to 0800 hrs 22/05/2024.
The forecast capacity reserve requirement is 1361 MW.
The minimum capacity reserve available is 1355 MW.
2. From 1700 hrs to 1930 hrs 22/05/2024.
The forecast capacity reserve requirement is 1324 MW.
The minimum capacity reserve available is 1305 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 21/05/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 116717 is cancelled at 2030 hrs 19/05/2024.
No LOR2 condition is currently forecast in the STPASA period.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 21/05/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 116701 has been updated at 1800 hrs 19/05/2024 to the following:
[1.] From 1630 hrs 21/05/2024 to 1900 hrs 21/05/2024.
The forecast capacity reserve requirement is 1220 MW.
The minimum capacity reserve available is 1183 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 22/05/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 116698 is cancelled at 1630 hrs 19/05/2024
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 21/05/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 116695 has been updated at 1430 hrs 19/05/2024 to the following:
[1.] From 1630 hrs 21/05/2024 to 2100 hrs 21/05/2024.
The forecast capacity reserve requirement is 1251 MW.
The minimum capacity reserve available is 1177 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.