113498RESERVE NOTICE19/01/2024 05:44:26 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 19/01/2024

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 19/01/2024

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.
The Actual LOR1 condition is not forecast in Pre Dispatch

The capacity reserve requirement is 982 MW
The minimum capacity reserve available is 938 MW

Manager NEM Real Time Operations
113468RESERVE NOTICE19/01/2024 10:53:52 AM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113466 is cancelled at 1000 hrs 19/01/2024.

No LOR2 condition is currently forecast in the STPASA period.

AEMO Operations
113466RESERVE NOTICE19/01/2024 09:40:25 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113465 has been updated at 0900 hrs 19/01/2024 to the following:

From 1830 hrs to 1900 hrs 22/01/2024.
The forecast capacity reserve requirement is 714 MW.
The minimum capacity reserve available is 563 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
113465RESERVE NOTICE19/01/2024 08:16:01 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

From 1830 hrs to 1900 hrs 22/01/2024.
The forecast capacity reserve requirement is 720 MW.
The minimum capacity reserve available is 708 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
113439RESERVE NOTICE18/01/2024 06:17:12 PM

Cancellation of Actual (LOR1) condition in the QLD region - 18/01/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 18/01/2024

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.113424 is cancelled at 1815 hrs 18/01/2024.

Manager NEM Real Time Operations
113424RESERVE NOTICE18/01/2024 03:46:27 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 18/01/2024

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 18/01/2024

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1530 hrs.
The Actual LOR1 condition is forecast to exist until 2000 hrs

The capacity reserve requirement is 952 MW
The minimum capacity reserve available is 857 MW

Manager NEM Real Time Operations
113415MARKET SYSTEMS18/01/2024 03:11:50 PM

CHG0082626 | Completed | Production | EMMS Production - FTP/Participant Intrface - Preventative maintenance.

Change Number: CHG0082626
Notification issued to: Market Notice

Notification Type: Completed
Change Type: Expedited

Service/Component: EMMS - Dispatch
Change Title: EMMS Production - FTP/Participant Intrface - Preventative maintenance.

Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
113407MARKET SYSTEMS18/01/2024 12:11:15 PM

CHG0082015 | Production | Brisbane MarketNet Firewall Refresh

Change Number: CHG0082015
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal

Service/ Component: Firewall
Change Title: Brisbane MarketNet Firewall Refresh

Change Start Date & Time: 24/02/2024 09:00:00 AEST
Change End Date & Time: 24/02/2024 15:00:00 AEST
Outage Start Date & Time:
Outage End Date & Time:

Environment: Production

Participant Impact and Requirements:
The following impacts are expected to participant connectivity during this planned outage:

IPWAN Participants - Nil

Lan-2-Lan VPN Participants (IPSEC) - Up to 6 hours for participants who have established their VPN connection/s via the AEMO QLD datacenter termination point (202.44.76.10) only - All L2L connections should be established to both QLD / NSW.

Note: Participants are encouraged to ensure their VPN connections are already established or are configured (as per AEMO best practice) to automatically failover to the alternate AEMO NSW datacenter termination point (202.44.78.10) prior to this scheduled outage.

B2B VPN - Up to 30 minutes outage to TNSPs with B2B VPN to AEMO QLD Datacentre if VPN connection is only terminating in QLD only

SSL VPN Participants: Up to 30 minutes outage to TNSPs with B2B VPN to AEMO QLD Datacentre if VPN connection is only terminating in QLD only

Other Impacts will have been communicated in advance.
Support Information:
Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?id=pp_services_status for any
planned/unplanned maintenance activities.
113352RESERVE NOTICE17/01/2024 10:00:51 AM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 19/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113346 is cancelled at 0900 hrs 17/01/2024.

No LOR2 condition is currently forecast in the STPASA period.

AEMO Operations