Filter by category
Filter by Date
Cancellation of Actual (LOR1) condition in the NSW region - 05/12/2023
Cancellation of Actual (LOR1) condition in the NSW region - 05/12/2023
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.112016 is cancelled at 1845 hrs 05/12/2023.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 05/12/2023
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 05/12/2023
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1800 hrs.
The Actual LOR1 condition is forecast to exist until 1900 hrs
The capacity reserve requirement is 1370 MW
The minimum capacity reserve available is 1350 MW
Manager NEM Real Time Operations
NEM Local Temperature Alerts for NSW, SA, VIC from 05 Dec 2023 to 09 Dec 2023
AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.
NSW
Mudgee Ap (39+ Deg C): 7th Dec, 8th Dec, 9th Dec
SA
Port Augusta Ap (39+ Deg C): 6th Dec, 7th Dec, 8th Dec
VIC
Mildura Ap (39+ Deg C): 5th Dec, 7th Dec, 8th Dec
The NEM Local Temperature Alert Levels are:
Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.
AEMO requests Market Participants to:
1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,
2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.
Further information is available at:
https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts
AEMO Operations Planning
[EventId:202312041700_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 04 December 2023 17:00
Issued by Australian Energy Market Operator Ltd at 1700 hrs on 4 December 2023
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 4 December 2023.
Refer to market notice: 112001
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1700 hrs on 4 December 2023.
This is an AEMO autogenerated Market Notice.
[EventId:202312041535_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 04 December 2023 15:35
Issued by Australian Energy Market Operator Ltd at 1535 hrs on 4 December 2023
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 4 December 2023.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1535 hrs on 4 December 2023.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202312041530_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 04 December 2023 15:30
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 4 December 2023
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 4 December 2023.
Refer to market notice: 111996
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1530 hrs on 4 December 2023.
This is an AEMO autogenerated Market Notice.
[EventId:202312041435_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 04 December 2023 14:35
Issued by Australian Energy Market Operator Ltd at 1435 hrs on 4 December 2023
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 4 December 2023.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1435 hrs on 4 December 2023.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202312041130_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 04 December 2023 11:30
Issued by Australian Energy Market Operator Ltd at 1130 hrs on 4 December 2023
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 4 December 2023.
Refer to market notice: 111988
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1130 hrs on 4 December 2023.
This is an AEMO autogenerated Market Notice.
[EventId:202312041015_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 04 December 2023 10:15
Issued by Australian Energy Market Operator Ltd at 1015 hrs on 4 December 2023
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 4 December 2023.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1015 hrs on 4 December 2023.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.