Filter by category
Filter by Date
Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 18/01/2024
Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 18/01/2024
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1530 hrs.
The Actual LOR1 condition is forecast to exist until 2000 hrs
The capacity reserve requirement is 952 MW
The minimum capacity reserve available is 857 MW
Manager NEM Real Time Operations
CHG0082626 | Completed | Production | EMMS Production - FTP/Participant Intrface - Preventative maintenance.
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Expedited
Service/Component: EMMS - Dispatch
Change Title: EMMS Production - FTP/Participant Intrface - Preventative maintenance.
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 25/01/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1700 hrs to 1800 hrs 25/01/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1418 MW.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 22/01/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
From 1730 hrs to 2030 hrs 22/01/2024.
The forecast capacity reserve requirement is 1250 MW.
The minimum capacity reserve available is 915 MW.
AEMO Operations
CHG0082015 | Production | Brisbane MarketNet Firewall Refresh
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: Firewall
Change Title: Brisbane MarketNet Firewall Refresh
Change Start Date & Time: 24/02/2024 09:00:00 AEST
Change End Date & Time: 24/02/2024 15:00:00 AEST
Outage Start Date & Time:
Outage End Date & Time:
Environment: Production
Participant Impact and Requirements:
The following impacts are expected to participant connectivity during this planned outage:
IPWAN Participants - Nil
Lan-2-Lan VPN Participants (IPSEC) - Up to 6 hours for participants who have established their VPN connection/s via the AEMO QLD datacenter termination point (202.44.76.10) only - All L2L connections should be established to both QLD / NSW.
Note: Participants are encouraged to ensure their VPN connections are already established or are configured (as per AEMO best practice) to automatically failover to the alternate AEMO NSW datacenter termination point (202.44.78.10) prior to this scheduled outage.
B2B VPN - Up to 30 minutes outage to TNSPs with B2B VPN to AEMO QLD Datacentre if VPN connection is only terminating in QLD only
SSL VPN Participants: Up to 30 minutes outage to TNSPs with B2B VPN to AEMO QLD Datacentre if VPN connection is only terminating in QLD only
Other Impacts will have been communicated in advance.
Support Information:
Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?id=pp_services_status for any
planned/unplanned maintenance activities.
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 18/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113396 is cancelled at 0430 hrs 18/01/2024
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 18/01/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1830 hrs 18/01/2024 to 1900 hrs 18/01/2024.
The forecast capacity reserve requirement is 1118 MW.
The minimum capacity reserve available is 1073 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 18/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113370 is cancelled at 1615 hrs 17/01/2024.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 18/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113359 has been updated at 1550 hrs to the following:
[1.] From 1830 hrs 18/01/2024 to 1900 hrs 18/01/2024.
The forecast capacity reserve requirement is 1144 MW.
The minimum capacity reserve available is 1057 MW.
Manager NEM Real Time Operations