119204SETTLEMENTS RESIDUE23/10/2024 08:15:25 AM

[EventId:202410230815_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 23 October 2024 08:15

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0815 hrs on 23 October 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 23 October 2024.

Refer to market notice: 119203

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.

The negative residue constraint NRM_SA1_VIC1 ceased operating at 0815 hrs on 23 October 2024.

This is an AEMO autogenerated Market Notice.
119203SETTLEMENTS RESIDUE23/10/2024 07:35:28 AM

[EventId:202410230735_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 23 October 2024 07:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0735 hrs on 23 October 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 23 October 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.

The negative residue constraint set NRM_SA1_VIC1 commenced operating from 0735 hrs on 23 October 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
119193RESERVE NOTICE22/10/2024 03:14:40 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 24/10/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 119153 has been updated at 1400 hrs 22/10/2024 to the following:

From 1730 hrs to 1930 hrs 24/10/2024.
The forecast capacity reserve requirement is 1198 MW.
The minimum capacity reserve available is 860 MW.

AEMO Operations
119191RESERVE NOTICE22/10/2024 03:11:06 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 24/10/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 119154 has been updated at 1400 hrs 22/10/2024 to the following:

1. From 0500 hrs to 0630 hrs 24/10/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1371 MW.

2. From 1730 hrs to 2359 hrs 24/10/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1361 MW.

AEMO Operations
119164SETTLEMENTS RESIDUE21/10/2024 05:20:21 PM

[EventId:202410211720_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 21 October 2024 17:20

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1720 hrs on 21 October 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 21 October 2024.

Refer to market notice: 119163

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1720 hrs on 21 October 2024.

This is an AEMO autogenerated Market Notice.
119163SETTLEMENTS RESIDUE21/10/2024 03:15:39 PM

[EventId:202410211515_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 21 October 2024 15:15

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1515 hrs on 21 October 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 21 October 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1515 hrs on 21 October 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
119162RESERVE NOTICE21/10/2024 03:08:27 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 25/10/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

From 0000 hrs to 0400 hrs 25/10/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1342 MW.

AEMO Operations
119154RESERVE NOTICE21/10/2024 03:07:03 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 24/10/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:

1. From 0430 hrs to 0630 hrs 24/10/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1338 MW.

2. From 1700 hrs to 2359 hrs 24/10/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1324 MW.

AEMO Operations
119153RESERVE NOTICE21/10/2024 03:05:37 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 24/10/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

From 1730 hrs to 1900 hrs 24/10/2024.
The forecast capacity reserve requirement is 1193 MW.
The minimum capacity reserve available is 1090 MW.

AEMO Operations