Filter by category
Filter by Date
[EventId:202411231800_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 23 November 2024 18:00
Issued by Australian Energy Market Operator Ltd at 1800 hrs on 23 November 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 23 November 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1800 hrs on 23 November 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 27/11/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 120825 has been updated at 1400 hrs 23/11/2024 to the following:
[1.] From 1530 hrs 27/11/2024 to 1630 hrs 27/11/2024.
The forecast capacity reserve requirement is 757 MW.
The minimum capacity reserve available is 480 MW.
[2.] From 2100 hrs 27/11/2024 to 2130 hrs 27/11/2024.
The forecast capacity reserve requirement is 1276 MW.
The minimum capacity reserve available is 875 MW.
[3.] From 2200 hrs 27/11/2024 to 2230 hrs 27/11/2024.
The forecast capacity reserve requirement is 1278 MW.
The minimum capacity reserve available is 1273 MW.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/11/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period[s]:
[1.] From 1400 hrs 28/11/2024 to 1430 hrs 28/11/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1367 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 27/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120822 has been updated at 1400 hrs 23/11/2024 to the following:
[1.] From 0800 hrs 27/11/2024 to 1030 hrs 27/11/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 813 MW.
[2.] From 2230 hrs 27/11/2024 to 0000 hrs 28/11/2024.
The forecast capacity reserve requirement is 1738 MW.
The minimum capacity reserve available is 1008 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120821 has been updated at 1400 hrs 23/11/2024 to the following:
[1.] From 1330 hrs 26/11/2024 to 1600 hrs 26/11/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 730 MW.
[2.] From 2030 hrs 26/11/2024 to 0000 hrs 27/11/2024.
The forecast capacity reserve requirement is 1729 MW.
The minimum capacity reserve available is 999 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 25/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120820 has been updated at 1400 hrs 23/11/2024 to the following:
[1.] From 1530 hrs 25/11/2024 to 1700 hrs 25/11/2024.
The forecast capacity reserve requirement is 1704 MW.
The minimum capacity reserve available is 1051 MW.
[2.] From 1730 hrs 25/11/2024 to 2100 hrs 25/11/2024.
The forecast capacity reserve requirement is 1693 MW.
The minimum capacity reserve available is 1452 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 24/11/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
[1.] From 1730 hrs 24/11/2024 to 1830 hrs 24/11/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1267 MW.
Manager NEM Real Time Operations
[EventId:202411221940_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 22 November 2024 19:40
Issued by Australian Energy Market Operator Ltd at 1940 hrs on 22 November 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 22 November 2024.
Refer to market notice: 120834
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1940 hrs on 22 November 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202411221820_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 22 November 2024 18:20
Issued by Australian Energy Market Operator Ltd at 1820 hrs on 22 November 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 22 November 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1820 hrs on 22 November 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.