Filter by category
Filter by Date
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 27/11/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 120825 has been updated at 1400 hrs 23/11/2024 to the following:
[1.] From 1530 hrs 27/11/2024 to 1630 hrs 27/11/2024.
The forecast capacity reserve requirement is 757 MW.
The minimum capacity reserve available is 480 MW.
[2.] From 2100 hrs 27/11/2024 to 2130 hrs 27/11/2024.
The forecast capacity reserve requirement is 1276 MW.
The minimum capacity reserve available is 875 MW.
[3.] From 2200 hrs 27/11/2024 to 2230 hrs 27/11/2024.
The forecast capacity reserve requirement is 1278 MW.
The minimum capacity reserve available is 1273 MW.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/11/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period[s]:
[1.] From 1400 hrs 28/11/2024 to 1430 hrs 28/11/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1367 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 27/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120822 has been updated at 1400 hrs 23/11/2024 to the following:
[1.] From 0800 hrs 27/11/2024 to 1030 hrs 27/11/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 813 MW.
[2.] From 2230 hrs 27/11/2024 to 0000 hrs 28/11/2024.
The forecast capacity reserve requirement is 1738 MW.
The minimum capacity reserve available is 1008 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120821 has been updated at 1400 hrs 23/11/2024 to the following:
[1.] From 1330 hrs 26/11/2024 to 1600 hrs 26/11/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 730 MW.
[2.] From 2030 hrs 26/11/2024 to 0000 hrs 27/11/2024.
The forecast capacity reserve requirement is 1729 MW.
The minimum capacity reserve available is 999 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 25/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120820 has been updated at 1400 hrs 23/11/2024 to the following:
[1.] From 1530 hrs 25/11/2024 to 1700 hrs 25/11/2024.
The forecast capacity reserve requirement is 1704 MW.
The minimum capacity reserve available is 1051 MW.
[2.] From 1730 hrs 25/11/2024 to 2100 hrs 25/11/2024.
The forecast capacity reserve requirement is 1693 MW.
The minimum capacity reserve available is 1452 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 24/11/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
[1.] From 1730 hrs 24/11/2024 to 1830 hrs 24/11/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1267 MW.
Manager NEM Real Time Operations
[EventId:202411221940_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 22 November 2024 19:40
Issued by Australian Energy Market Operator Ltd at 1940 hrs on 22 November 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 22 November 2024.
Refer to market notice: 120834
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1940 hrs on 22 November 2024.
This is an AEMO autogenerated Market Notice.
Inter-regional transfer limit variation - Directlink - NSW region - 22/11/2024
Inter-regional transfer limit variation - Directlink - NSW region - 22/11/2024
At 1911 hrs 22/11/2024 there was an unplanned outage of the No.2 leg of Directlink.
The following constraint set(s) invoked at 1920 hrs 22/11/2024
N-X_MBTE_2
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 22/11/2024
Cancellation of Actual (LOR1) condition in the NSW region - 22/11/2024
The Actual LOR1 Condition in the NSW region advised in AEMO Electricity Market Notice No.120833 is cancelled at 1838 hrs 22/11/2024.
Manager NEM Real Time Operations