76510INTER-REGIONAL TRANSFER02/08/2020 06:57:50 PM

Inter-regional transfer limit variation SA region. Para No2 275 kV SVC 02/08/2020

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation SA region. Para No2 275 kV SVC 02/08/2020

An unplanned outage of the Para No2 275 kV SVC occurred at 1833 hrs

The following constraint set was invoked at 1840 hrs until further notice.

S-X_PA_VC_2

The constraint set contains equations with the following interconnectors on the LHS.

V-S-MNSP1
V-SA

Refer to AEMO Network Outage Scheduler (NOS) for further details.


Manager NEM Real Time Operations



76509NON-CONFORMANCE02/08/2020 05:25:09 PM

NON-CONFORMANCE Region VIC1 Sunday, 2 August 2020

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE VIC1 Region Sunday, 2 August 2020

AEMO declared a schedule generating unit non-conforming

Unit: LOYYB2
Duration: 02/08/2020 17:20 to 02/08/2020 17:25
Amount: 38 MW
Constraint: NC-V_LOYYB2

Auto-generated on behalf of Manager NEM Real Time Operations
76508RESERVE NOTICE02/08/2020 03:32:17 PM

STPASA - Update Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region on 07/08/2020

AEMO ELECTRICITY MARKET NOTICE

The forecast LOR1 condition in the Tasmania region advised in AEMO Electricity Market Notice No. 76504 has been updated at 1530 hrs 02/08/2020 to the following:

From 0730 hrs to 0900 hrs on 07/08/2020.
The forecast capacity reserve requirement is 731 MW.
The minimum capacity reserve available is 703 MW.

Manager NEM Real Time Operations
76507MARKET INTERVENTION01/08/2020 03:26:25 PM

Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region - 31/07/2020

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region - 31/07/2020

Refer Market Notice 76501

The AEMO Intervention Event and all associated directions are cancelled from 1530 hrs 01/08/2020

Manager NEM Real Time Operations
76504RESERVE NOTICE01/08/2020 02:29:46 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region on 07/08/2020

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the Tasmania region for the following period:

From 0800 hrs to 0830 hrs on 07/08/2020.
The forecast capacity reserve requirement is 731 MW.
The minimum capacity reserve available is 725 MW.

Manager NEM Real Time Operations
76503INTER-REGIONAL TRANSFER01/08/2020 01:07:40 PM

Inter-regional transfer limit variation: Hazelwood - South Morang No 1 500 kV Line (VIC) - Voltage Control

AEMO ELECTRICITY MARKET NOTICE

The Hazelwood - South Morang No 1 500 kV Line has been de-energised to manage voltages in the Victoria region.

The following constraint set was invoked at 1305 hrs

V-HWSM

The constraint set contains equations with the following interconnectors on the LHS.

T-V-MNSP
V-S-MNSP1
V-SA
VIC1-NSW1

Refer to AEMO Network Outage Scheduler (NOS) for further details

Manager NEM Real Time Operations
76502MARKET SYSTEMS31/07/2020 05:42:00 PM

AEMO Help Desk Bulletin No. 2506 : CHG0059921 : Planned Software Change - MSATS B2B e-Hub - SMP-125

Market Notice

Change Number: CHG0059921

Notification issued to: Market Notice

Notification Type: Initial

Change Type: Normal

Service/ Component: MSATS - Business to Business data exchange

Change Title: Planned Software Change - MSATS B2B e-Hub - SMP-125

Change Start Date & Time: 05/08/2020 17:30:00 AEST

Change End Date & Time: 05/08/2020 19:30:00 AEST

Outage Start Date & Time: 05/08/2020 17:30:00 AEST

Outage End Date & Time: 05/08/2020 19:30:00 AEST

Change Description:

AEMO is conducting production network connection improvements to API accessibility in our production environment impacting the following URLs:
- https://apis.prod.marketnet.net.au:9319
- https://apis.prod.aemo.com.au:9319

Environment: Production

Participant Impact and Requirements:

During the change window, any API requests may result in a 500 series or a timeout error.

AEMO anticipates no action from Market Participants is required. Outside this change window connections should continue to function as normal.

Report any impacts to the AEMO Information and Support Hub Internal ext. 5335 or on External 1300 236 600.

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
76501MARKET INTERVENTION31/07/2020 03:42:17 PM

Direction - SA region 31/07/2020

AEMO ELECTRICITY MARKET NOTICE.

Direction - SA region 31/07/2020

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all dispatch intervals during the event to be intervention dispatch intervals, commencing from the interval ending 1535 hrs on 31/ 07 /2020.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations




76498MARKET INTERVENTION31/07/2020 02:58:31 PM

Update Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Update Possible intervention to manage power system security in South Australia (SA) Region

Refer AEMO Electricity Market Notice 76496

The synchronous generating units expected to be synchronised in SA from 0930 hrs 01/08/2020 to 1530 hrs 01/08/2020 in Pre-dispatch published at 1430 hrs 30/07/2020 are inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO currently estimates that, in the absence of sufficient market response by 1530 hrs 31/07/2020, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.