-
-
Consultation on proposed amendments to the Guidelines for Preparing Local Black System Procedures (LBSP)
-
In this section
-
In this section
- Enhancements to RERT rule change - Update to Procedures
- Manual Load Shedding Standard
- NEM Customer Switching Consultation
- Settlements Guide to Ancillary Services Payment and Recovery Consultation
- B2B Procedures v3.4 Consultation
- Five Minute Settlement - Procedure for the Dispatch and Activation of Reserve Contracts
- Five-Minute Settlement – Metering Procedure Changes (Package 3)
- Declared NEM Project – 5MS Program
- Consultation on proposed amendments to the Guidelines for Preparing Local Black System Procedures (LBSP)
- Primary Frequency Response under Normal Operating Conditions
- Dispatch Procedures (Spot Market, Non-Rules Consultation Package)
- Dispatch – Miscellaneous procedures (non-rules consultation)
- 2019 Planning and Forecasting Consultation
- Book Build Procedure Consultation
- Five-Minute Settlement – Metering Procedure Changes (Package 2)
- Procedures For Directions And Instructions Consultation
- Spot Market Operations Timetable
- Metering ICF Package Consultation
- Reliability Forecasting Methodology Consultation
- Five Minute Settlement - Credit Limit Procedures
-
-
AEMO is commencing a second stage consultation on the proposed amendments to the Guidelines for Preparing Local Black System Procedures (LBSP) under clause 4.8.12(e) of the National Electricity Rules (NER). The purpose of the proposed amendments is to improve the quality and usefulness of the LBSPs in current and future power system conditions, and enable AEMO to better reflect the capabilities of newer generation technologies in system restart procedures.
AEMO is particularly consulting with Generators and NSPs, being the registered participant categories required to prepare and submit LBSPs under the NER. Some very large loads will also play an important role in system restart, therefore AEMO invites interested Market Customers (or relevant end users) to participate in this consultation.
Submissions in response to the second stage consultation should be sent by email to LBSP.consultation@aemo.com.au to reach AEMO by 5:00pm (Melbourne time) on 18 November 2019.
Second stage consultation documents
- Consultation report (267 KB, pdf)
- Guidelines for preparing Local Black System Procedures (changes marked) (329 KB, pdf)
- Generator LBSP Template (changes marked) (294 KB, pdf)
- NSP LBSP template (changes marked) (186 KB, pdf)
- DC Links LBSP template (changes marked) (117 KB, pdf)
- Major Loads LBSP template (changes marked) (80 KB, pdf)
First stage consultation documents
- Notice of Consultation (154 KB, pdf)
- Guidelines for Preparing Local Black System Procedures (295 KB, pdf)
- Information to be included in Generator LBSPs (257 KB, pdf)
- Information to be included in LBSPs of DC Links (107 KB, pdf)
- Information to be included in TNSP/DNSP LBSPs (175 KB, pdf)
- Information to be included in major industrial load LBSPs (73 KB, pdf)
First stage submissions
- AusGrid (946 KB, pdf)
- TransGrid (457 KB, pdf)
- MEA Group/Powershop (71 KB, pdf)