[EventId:202402081335_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 08 February 2024 13:35
Issued by Australian Energy Market Operator Ltd at 1335 hrs on 8 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1335 hrs on 8 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202402081200_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 08 February 2024 12:00
Issued by Australian Energy Market Operator Ltd at 1200 hrs on 8 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 February 2024.
Refer to market notice: 114435
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1200 hrs on 8 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402080840_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 08 February 2024 08:40
Issued by Australian Energy Market Operator Ltd at 0840 hrs on 8 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0840 hrs on 8 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202402071720_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 07 February 2024 17:20
Issued by Australian Energy Market Operator Ltd at 1720 hrs on 7 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 February 2024.
Refer to market notice: 114422
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1720 hrs on 7 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402071600_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 07 February 2024 16:00
Issued by Australian Energy Market Operator Ltd at 1600 hrs on 7 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1600 hrs on 7 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Update - Direction - SA Region - 04/02/2024
Update - Direction - SA Region - 04/02/2024
Refer Market Notice 114245
The AEMO intervention event that commenced from interval ending 1635hrs on 04/02/2024 is continuing.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
Manager NEM Real Time Operations
[EventId:202402071330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 07 February 2024 13:30
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 7 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 February 2024.
Refer to market notice: 114412
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 7 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402070835_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 07 February 2024 08:35
Issued by Australian Energy Market Operator Ltd at 0835 hrs on 7 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0835 hrs on 7 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1800 hrs 06/02/2024 to 1930 hrs 06/02/2024.
The forecast capacity reserve requirement is 1179 MW.
The minimum capacity reserve available is 988 MW.
Manager NEM Real Time Operations