114379RESERVE NOTICE06/02/2024 04:17:34 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114359 has been updated at 1615 hrs to the following:

[1.] From 1830 hrs 06/02/2024 to 1900 hrs 06/02/2024.
The forecast capacity reserve requirement is 1128 MW.
The minimum capacity reserve available is 1095 MW.

Manager NEM Real Time Operations
114378RESERVE NOTICE06/02/2024 03:24:24 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/02/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

From 1730 hrs to 1800 hrs 13/02/2024.
The forecast capacity reserve requirement is 1515 MW.
The minimum capacity reserve available is 1478 MW.

AEMO Operations
114359RESERVE NOTICE06/02/2024 11:12:44 AM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114357 has been updated at 1110 hrs to the following:

[1.] From 1730 hrs 06/02/2024 to 2030 hrs 06/02/2024.
The forecast capacity reserve requirement is 1014 MW.
The minimum capacity reserve available is 884 MW.

Manager NEM Real Time Operations
114357RESERVE NOTICE06/02/2024 10:03:46 AM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114355 has been updated at 1000 hrs to the following:

[1.] From 1800 hrs 06/02/2024 to 1930 hrs 06/02/2024.
The forecast capacity reserve requirement is 1040 MW.
The minimum capacity reserve available is 1015 MW.

Manager NEM Real Time Operations
114355RESERVE NOTICE06/02/2024 08:54:44 AM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:

[1.] From 1830 hrs 06/02/2024 to 1900 hrs 06/02/2024.
The forecast capacity reserve requirement is 1178 MW.
The minimum capacity reserve available is 1073 MW.


Manager NEM Real Time Operations
114354RESERVE NOTICE06/02/2024 05:13:58 AM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114347 is cancelled at 0510 hrs 06/02/2024.

Manager NEM Real Time Operations
114347RESERVE NOTICE06/02/2024 01:09:27 AM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:

[1.] From 1830 hrs 06/02/2024 to 1900 hrs 06/02/2024.
The forecast capacity reserve requirement is 1125 MW.
The minimum capacity reserve available is 1073 MW.


Manager NEM Real Time Operations
114337SETTLEMENTS RESIDUE05/02/2024 07:20:15 PM

[EventId:202402051920_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 05 February 2024 19:20

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1920 hrs on 5 February 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 5 February 2024.

Refer to market notice: 114336

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.

The negative residue constraint NRM_QLD1_NSW1 ceased operating at 1920 hrs on 5 February 2024.

This is an AEMO autogenerated Market Notice.
114336SETTLEMENTS RESIDUE05/02/2024 06:40:57 PM

[EventId:202402051835_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 05 February 2024 18:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1835 hrs on 5 February 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 5 February 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.

The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1835 hrs on 5 February 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.