STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114068 has been updated at 1400 hrs 01/02/2024 to the following:
From 1800 hrs to 1930 hrs 06/02/2024.
The forecast capacity reserve requirement is 1264 MW.
The minimum capacity reserve available is 944 MW.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 05/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
From 1830 hrs to 1900 hrs 05/02/2024.
The forecast capacity reserve requirement is 1267 MW.
The minimum capacity reserve available is 1151 MW.
AEMO Operations
[EventId:202402011235_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 01 February 2024 12:35
Issued by Australian Energy Market Operator Ltd at 1235 hrs on 1 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 1 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1235 hrs on 1 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202402011130_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 01 February 2024 11:30
Issued by Australian Energy Market Operator Ltd at 1130 hrs on 1 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 1 February 2024.
Refer to market notice: 114100
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1130 hrs on 1 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402011005_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 01 February 2024 10:05
Issued by Australian Energy Market Operator Ltd at 1005 hrs on 1 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 1 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1005 hrs on 1 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 04/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114017 is cancelled at 1400 hrs 31/01/2024.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 05/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114019 has been updated at 1400 hrs 31/01/2024 to the following:
1. From 1400 hrs to 1630 hrs 05/02/2024.
The forecast capacity reserve requirement is 1462 MW.
The minimum capacity reserve available is 905 MW.
2. From 1700 hrs to 2000 hrs 05/02/2024.
The forecast capacity reserve requirement is 1460 MW.
The minimum capacity reserve available is 995 MW.
AEMO Operations
Update - Direction - SA Region - 28/01/2024
Update - Direction - SA Region - 28/01/2024
Refer Market Notice 113930
The AEMO intervention event that commenced from interval ending 1705 hrs on 28/01/2024 is continuing.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 06/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114021 has been updated at 1400 hrs 31/01/2024 to the following:
1. From 1400 hrs to 1730 hrs 06/02/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 813 MW.
2. From 1900 hrs to 2100 hrs 06/02/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 892 MW.
AEMO Operations