Market Notices

67646RECLASSIFY CONTINGENCY07/03/2019 12:27:40 PM

Reclassification of a Non-Credible Contingency Event: Bulli Creek - Dumaresq 8L 330KV line and Bulli Creek - Dumaresq 8M 330KV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Bulli Creek - Dumaresq 8L 330KV and Bulli Creek - Dumaresq 8M 330KV

Duration: 07/03/2019 12:27 until further notice

Constraint set(s) invoked:
I-QNI_ONE_PHASE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NSW1-QLD1


Auto-generated on behalf of Manager NEM Real Time Operations
67645GENERAL NOTICE07/03/2019 07:57:44 AM

Update Planned outage of Heywood 500 kV Bus at Heywood in the VIC region, on 07/03/2019

AEMO ELECTRICITY MARKET NOTICE

Refer AEMO Electricity Market Notice 67606

The Heywood No. 2 500 kV Bus, Heywood M2 transformer and Heywood 500 kV CB (213) at Heywood in the Victoria region are planned to be out of service from 0900 hrs on 07/03/2019 to 1100 hrs on 07/03/2019.

A credible contingency event during this planned outage could cause synchronous separation of the South Australia (SA) region from the rest of the NEM. If separation occurs, load may be interrupted due to the operation of the Automatic Under Frequency Load Shedding (AUFLS) scheme in SA.

The credible separation contingency is managed as follows:
When power transfer is from SA to Victoria, contingency lower FCAS will be sourced from SA.
When power transfer is from Victoria to SA, due to the 47-52Hz Island separation frequency band advised by the SA jurisdiction, contingency raise FCAS is not sourced in SA and the AUFLS scheme may respond to low frequency events.

Forecast capacity reserves in the SA region are currently sufficient to meet electricity demand during the planned outage.

The following constraint sets have been invoked for this outage:
F-I-HYSE
I-VS_050
S-X_BC_CP
V-HYTX_M12
V-HY_500BUS

Refer AEMO Network Outage Schedule (NOS) for further details.

Manager NEM Real Time Operations
67644GENERAL NOTICE07/03/2019 08:59:12 AM

Planned outage of Moorabool -Tarrone 500 kV line in the Victoria region on 08/03/2019

AEMO ELECTRICITY MARKET NOTICE

The Moorabool -Tarrone 500 kV line in the Victoria (VIC) region is now planned to be out of service from 0600 hrs to 1700 hrs on 08/03/2019.

A credible contingency event during this planned outage could cause synchronous separation of the South Australia (SA) region from the rest of the NEM. If separation occurs, load may be interrupted due to the operation of the Automatic Under Frequency Load Shedding (AUFLS) scheme in SA.

The credible separation contingency is managed as follows:

- When power transfer is from SA to Victoria, contingency lower FCAS will be sourced from SA.
- When power transfer is from Victoria to SA, due to the 47-52Hz island separation frequency band advised by the SA jurisdiction, contingency raise FCAS is not sourced in SA and the AUFLS scheme may respond to low frequency events.
- Power transfer will be restricted sufficiently low on Victoria - South Australia interconnector (Heywood interconnector) to manage system security following the loss of the next contingency.

Forecast capacity reserves in the SA region are currently sufficient to meet electricity demand during the planned outage.

The following constraint sets have been invoked for this outage:

F-V-MLTR
I-VS_050
S-X_BC_CP
V-MACARTHUR_ZERO
V-MLTR

Refer AEMO Network Outage Schedule (NOS) for further details.

Danushka Sooriyadasa
AEMO Operations
67643GENERAL NOTICE07/03/2019 07:13:47 AM

Cancellation: Planned outage of Moorabool - Tarrone 500 kV line in the Victoria region on 07/03/2019

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Planned outage of Moorabool - Tarrone 500 kV line in the Victoria region on 07/03/2019

Refer AEMO Electricity Market Notice 67630.

The Moorabool -Tarrone 500 kV line in the Victoria (VIC) region was planned to be out of service from 0630 hrs to 1700 hrs on 07/03/2019.

This planned outage has been postponed until further notice.

All constraint sets associated with this outage have been revoked.

Manager NEM Real Time Operations
67642NON-CONFORMANCE07/03/2019 06:20:18 AM

NON-CONFORMANCE Region NSW1 Thursday, 7 March 2019

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE NSW1 Region Thursday, 7 March 2019

AEMO declared a schedule generating unit non-conforming

Unit: VP6
Duration: 07/03/2019 06:15 to 07/03/2019 06:20
Amount: -31 MW
Constraint: NC-N_VP6

Auto-generated on behalf of Manager NEM Real Time Operations
67641RECLASSIFY CONTINGENCY07/03/2019 05:21:12 AM

Cancellation of a Non-Credible Contingency Event: Clare South- King Creek 7128/2 132kV line and Strathmore - Clare South 7208 132kV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: QLD1

Lines: Clare South- King Creek 7128/2 132kV and Strathmore - Clare South 7208 132kV

Cancellation time: 07/03/2019 05:21

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 67637

Auto-generated on behalf of Manager NEM Real Time Operations
67640RECLASSIFY CONTINGENCY07/03/2019 05:21:15 AM

Cancellation of a Non-Credible Contingency Event: Ross - Chalumbin No.857 275 kV line and Ross - Chalumbin No.858 275 kV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: QLD1

Lines: Ross - Chalumbin No.857 275 kV and Ross - Chalumbin No.858 275 kV

Cancellation time: 07/03/2019 05:21

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 67636

Auto-generated on behalf of Manager NEM Real Time Operations
67639RECLASSIFY CONTINGENCY07/03/2019 05:19:45 AM

Cancellation of a Non-Credible Contingency Event: Collinsville - Stoney Creek No.7306 132 kV line and Collinsville - Newlands No.7121 132 kV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: QLD1

Lines: Collinsville - Stoney Creek No.7306 132 kV and Collinsville - Newlands No.7121 132 kV

Cancellation time: 07/03/2019 05:19

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 67638

Auto-generated on behalf of Manager NEM Real Time Operations
67638RECLASSIFY CONTINGENCY07/03/2019 04:16:00 AM

Reclassification of a Non-Credible Contingency Event: Collinsville - Stoney Creek No.7306 132 kV line and Collinsville - Newlands No.7121 132 kV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Collinsville - Stoney Creek No.7306 132 kV and Collinsville - Newlands No.7121 132 kV

Duration: 07/03/2019 04:15 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations