Filter by category
Filter by Date
Reclassification of a Non-Credible Contingency Event: Hazelwood Terminal Station - South Morang No. 1 and No. 2 500 kV lines in VIC due to bushfires.
Reclassification of a non-credible contingency event as a credible contingency event due to bushfires.
AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: VIC1
Lines: Hazelwood Terminal Station - South Morang No. 1 and No. 2 500 kV Lines
Duration: 03/03/2019 12:05 until further notice
Constraint set(s) invoked: Nil
Manager NEM Real Time Operations
Non-Credible Contingency Event is more likely to occur because of the existence of Abnormal Conditions in Victoria 03/03/2019
AEMO has identified that a non-credible contingency event is more likely to occur because of the existence of abnormal conditions created by bushfires in the Victoria region.
AEMO will continue to monitor the conditions and modify the technical envelope as required.
Manager NEM Real Time Operations
Cancellation - Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region)
Cancellation - Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region)
Refer to AEMO Electricity Market Notice 67544
AEMO has been notified that the controls to vary Directlink output are now available.
The following constraint set was revoked at 0300 hrs 03/03/2019.
Constraint set I-CTRL_ISSUE_TE
The constraint set contains equations with the following interconnector on the LHS:
N-Q-MNSP1
Manager NEM Real Time Operations
Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region)
Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region)
AEMO has been notified that the controls to vary Directlink output are unavailable until further notice.
Constraint set I-CTRL_ISSUE_TE invoked from 2355 hrs 02/03/2019.
The constraint set contains equations with the following interconnector on the LHS:
N-Q-MNSP1
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn 7 & 8 220 kV Lines in Vic due to Bushfire
Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn 7 & 8 220 kV Lines in Vic due to Bushfire.
AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: Vic
Lines: Rowville - Yallourn 7 & 8 220 kV Lines
Duration: 1540 hrs 02/03/2019 until further notice
Constraint set(s) invoked: NIL
Manager NEM Real Time Operations
[EventId:201903021135_confirmed] Prices for interval 02-Mar-2019 11:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1155 hrs on 2 March 2019
PRICES ARE NOW CONFIRMED for dispatch interval 02-Mar-2019 11:35.
In accordance with Market Notice 67532 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:201903021155_confirmed] Prices for interval 02-Mar-2019 11:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1155 hrs on 2 March 2019
PRICES ARE NOW CONFIRMED for dispatch interval 02-Mar-2019 11:55.
In accordance with Market Notice 67536 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:201903021150_confirmed] Prices for interval 02-Mar-2019 11:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1155 hrs on 2 March 2019
PRICES ARE NOW CONFIRMED for dispatch interval 02-Mar-2019 11:50.
In accordance with Market Notice 67535 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:201903021145_confirmed] Prices for interval 02-Mar-2019 11:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1155 hrs on 2 March 2019
PRICES ARE NOW CONFIRMED for dispatch interval 02-Mar-2019 11:45.
In accordance with Market Notice 67534 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.