Filter by category
Filter by Date
Cancellation Inter-Regional Transfer limit variation Terranora - 21 June 2016
Cancellation Inter-Regional Transfer limit variation Terranora - 21 June 2016
Refer AEMO Electricity Market notice - 54001
The power flow on the Terranora interconnector is now following the value determined by the NEM dispatch algorithm.
The Constraint Set I-CTRL_ISSUE_TE has been revoked at 1615 hrs.
This Constraint Set contains an equation with the following interconnector on the LHS.
N-Q-MNSP1
Manager NEM Real Time Operations
RESERVE NOTICE MT PASA PUBLICATION 21 JUNE 2016
The MT PASA RELIABILITY_LRC results published on 21 June 2016 forecast shows low reserve conditions (LRC) in South Australia for Summer 2016-17 and Summer 2017-18. AEMO will continue to monitor the situation and take appropriate actions, if necessary.
The MT PASA results for the next 12 months are summarised at:
http://www.aemo.com.au/Electricity/Data/Forecast-Supply-and-Demand/Medium-Term-Outlook
This notice supersedes Market Notice 53965 published on 14 June 2016.
Please find the following information on some key inputs used in MT PASA:
Static minimum reserve levels (MRLs) have been specified for QLD, NSW and TAS regions as follows:
QLD: 913 MW
NSW: -1564 MW
TAS: 144 MW
The following optimum shared minimum reserve levels between Victoria and South Australia regions have been specified:
VIC Reserve >= 205.00
5.88 * VIC Reserve + SA Reserve >= 1237.88
1.33 * VIC Reserve + SA Reserve >= 228.00
0.43 * VIC Reserve + SA Reserve >= -40.53
0.23 * VIC Reserve + SA Reserve >= -147.55
SA Reserve >= -368.00
In order to remain consistent with the calculation of the minimum reserve levels, the following interconnector headroom constraints (net import/export limit constraints) have also been applied in MT PASA:
QLD: 0 MW of maximum net import into QLD.
NSW: 330 MW of minimum net export from NSW.
VIC: 940MW of maximum net import into VIC.
SA: 0 MW of maximum net import into SA.
Demand Side Participation included in MT PASA are:
Summer: QLD 156 MW, NSW 422 MW, VIC 245 MW, SA 167 MW and TAS 73 MW
Winter: QLD 156 MW, NSW 422 MW, VIC 185 MW, SA 167 MW and TAS 73 MW
Supply Planning
AEMO
Inter-Regional Transfer limit variation Terranora - 21 June 2016
Inter-Regional Transfer limit variation Terranora - 21 June 2016
The power flow on the Terranora interconnector is not following the value determined by the NEM dispatch algorithm.
The Constraint Set I-CTRL_ISSUE_TE has been invoked from 1440 hrs until further notice.
This Constraint Set contains an equation with the following interconnector on the LHS.
N-Q-MNSP1
Manager NEM Real Time Operations
[EventId:201606200705_confirmed] Prices for interval 20-Jun-2016 07:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0702 hrs on 20 June 2016
PRICES ARE NOW CONFIRMED for dispatch interval 20-Jun-2016 07:05.
In accordance with Market Notice 53999 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:201606200705_review] Prices for interval 20-Jun-2016 07:05 are subject to review
Issued by Australian Energy Market Operator Ltd at 0700 hrs on 20 June 2016
PRICES ARE SUBJECT TO REVIEW for dispatch interval 20-Jun-2016 07:05.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2(b) of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Collinsville North - Mackay Tee Proserpine 7125 and 7126 132kV Lines in Queensland due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Collinsville North - Mackay Tee Proserpine 7125 and 7126 132kV Lines in Queensland due to Lightning.
Refer AEMO Electricity Market Notice 53992
There is no longer any lightning activity in the vicinity of the Collinsville North - Mackay Tee Proserpine 7125 and 7126 132kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 1015 hrs.
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Collinsville - Stoney Ck 7306 and Collinsville - Newlands 7121 132 kV Lines in Qld Region due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Collinsville - Stoney Ck 7306 and Collinsville - Newlands 7121 132 kV Lines in Qld Region due to Lightning.
Refer to AEMO Electricity Market Notice 53993
There is no longer any lightning activity in the vicinity of the Collinsville - Stoney Ck 7306 and Collinsville - Newlands 7121 132 kV Lines
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event from 0650 hrs.
Manager NEM Real Time Operations
Cancellation of the reclassification of a Non Credible Contingency event: Kemmis-Moranbah Tee Burton Downs 7117 and Nebo-Moranbah Tee Coppabella 7118 132kV lines in Queensland.
Cancellation of the reclassification of a Non Credible Contingency event: Kemmis-Moranbah Tee Burton Downs 7117 and Nebo-Moranbah Tee Coppabella 7118 132kV lines in Queensland.
Refer AEMO Electricity Market Notice 53994
Lightning activity has ceased in the vicinity of the Kemmis-Moranbah Tee Burton Downs 7117 and Nebo-Moranbah Tee Coppabella 7118 132kV lines.
AEMO has cancelled the declaration of the simultaneous trip of those circuits as a credible contingency event at 0650 hrs.
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Ross - Chalumbin 857 and 858 275kV Lines in Queensland due to Lightning
Cancellation of the Reclassification of a Non-Credible Contingency Event: Ross - Chalumbin 857 and 858 275kV Lines in Queensland due to Lightning
Refer to AEMO Electricity Market Notice No. 53991
There is no longer any lightning activity in the vicinity of the Ross - Chalumbin 857 and 858 275kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 0650 hrs Sunday, 19 June 2016.
Manager NEM Real Time Operations