Filter by category
Filter by Date
[EventId:201610312035_confirmed] Prices for interval 31-Oct-2016 20:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 2030 hrs on 31 October 2016
PRICES ARE NOW CONFIRMED for dispatch interval 31-Oct-2016 20:35.
In accordance with Market Notice 55530 AEMO has reviewed this dispatch interval and determined that:
- Over-Constrained Dispatch has been resolved for this interval
Changed Prices ($/MWh)
TYPE
Region Original Adjusted
Price Price
ENERGY
NSW1 $50.56 $60.98
QLD1 $54.11 $64.37
SA1 $14,000.00 $95.98
TAS1 $39.66 $48.66
VIC1 $42.28 $51.87
RAISEREG
NSW1 $7.40 $12.66
QLD1 $7.40 $12.66
SA1 $7.40 $12.66
TAS1 $7.40 $12.66
VIC1 $7.40 $12.66
This is an AEMO autogenerated Market Notice.
Update - Non-credible contingency event - NSW Region - 28 Oct 2016
Update - Non-credible contingency event - NSW Region - 28 Oct 2016
Refer to MN 55483
At 1400hrs 29/10/16 the Canberra - Williamsdale No.3C 330kV transmission line and the Williamsdale 1 330/132 kV transformer were returned to service.
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - NSW region - 28 Oct 2016
Non-credible contingency event - NSW region - 28 Oct 2016
At 0543 hrs the Canberra - Williamsdale No.3C 330kV transmission line and the Williamsdale 1 330/132 kV transformer tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Update - Non-credible contingency event - Qld Region - 21 Oct 2016
Update - Non-credible contingency event - Qld Region - 21 Oct 2016
Refer to MN 55453
At 2101 hrs the Townsville South No 2 132kV Bus was returned to service.
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - Queensland region 21 October 2016
Townsville South Number 2 bus trip.
AEMO has become aware of the following circumstance(s) with respect to the power system,
At 1408 hrs the Townsville South Number 2 bus tripped. This disconnected the following feeders:
7303 Townsville South - Mount Stuart 132 kV line
7243 Townsville South - Mount Stuart 132 kV line
7130 Townsville South - Invicta Mill Tee Clare South 132 kV line
7249 Townsville South - Ross 132 kV line
7237 Townsville South - Townsville Zinc 132 kV line
The following constraint sets have been invoked
Q-MSPTS_7243
Q-MSPTS_7303
AEMO did not instruct load shedding.
Simultaneously with this event AEMO has observed a reduction in the electrical demand in the Queensland region of approximately 60 MW.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
AEMO advises that a Black system condition in the South Australia region is no longer current.
AEMO advises that a Black system condition in the South Australia region is no longer current.
Refer Market notice 54985
AEMO has given clearance to restore the last load block in South Australia.
The Black System condition is lifted at 1825 hrs 29 September 2016.
The Spot Market will continue to be suspended, please refer to AEMO Market notice 55047
Manager NEM Real Time Operations
[EventId:201609282335_confirmed] Prices for interval 28-Sep-2016 23:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1753 hrs on 29 September 2016
PRICES ARE NOW CONFIRMED for dispatch interval 28-Sep-2016 23:35.
In accordance with Market Notice 55024 AEMO has reviewed this dispatch interval and determined that:
- Over-Constrained Dispatch has been resolved for this interval
Changed Prices ($/MWh)
TYPE
Region Original Adjusted
Price Price
ENERGY
TAS1 $14.63 $14.63
VIC1 $10.50 $13.73
RAISE6SEC
NSW1 $6.79 $6.80
QLD1 $6.79 $6.80
TAS1 $6.79 $6.80
VIC1 $6.79 $6.80
RAISEREG
TAS1 $13.42 $10.01
This is an AEMO autogenerated Market Notice.
Market Suspension - Prices have been reviewed and were adjusted
Issued by Australian Energy Market Operator Ltd at 18:05 hrs on 29 Sept 2016
Further to the confirmed energy and ancillary service prices published in MN 55045, the energy and ancillary service price for South Australia is determined by the market suspension pricing schedule developed and published in accordance with clause 3.14.5(l) of the NER. The schedule is available on AEMO's website at https:/www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data/Market-Management-System-MMS/Market-Suspension-Default-Pricing-Schedule and summarised for South Australia at https://www.aemo.com.au/Media-Centre/-/media/81C836099BE5483185D7774ECC1B2F8A.ashx.
Manager Market Monitoring and Change
Update to South Australian system black restoration.
POWER SYSTEM EVENT
At 1618 hrs Wednesday, 28 September the SA power system separated from the NEM and became black. A very large lightning storm was traveling across the state at the time. Refer MN# 54994
At 0520 hrs the restoration is proceeding with approx. 900 MW restored in the South Australian region - load will continue to be restored and further updates will be given when information becomes available.
Due to potential damage in the north of the state, restoration in this part of the network could be delayed.
Manager NEM Real Time Operations