Update - Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016
Update to Market Notice 53574
Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016
AEMO declares a Forecast LOR1 condition for the Tasmania Region.
From 0700 hrs to 0930 hrs 01/06/16
The contingency capacity reserve required is 263 MW
The minimum reserve available is 190 MW
Manager NEM Real Time Operations
orecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016
Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016
AEMO declares a Forecast LOR1 condition for the Tasmania Region.
From 0730 hrs to 0830 hrs 01/06/16
The contingency capacity reserve required is 263MW
The minimum reserve available is 254 MW
Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Tuesday, 31 May 2016
NON-CONFORMANCE QLD1 Region Tuesday, 31 May 2016
AEMO declared a schedule generating unit non-conforming
Unit: BRAEMAR3
Duration: 31/05/2016 17:45 to 31/05/2016 17:55
Amount: 9 MW
Constraint: NC-Q_BRAEMAR3
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region VIC1 Tuesday, 31 May 2016
NON-CONFORMANCE VIC1 Region Tuesday, 31 May 2016
AEMO declared a schedule generating unit non-conforming
Unit: HWPS7
Duration: 31/05/2016 16:00 to 31/05/2016 16:05
Amount: -54 MW
Constraint: NC-V_HWPS7
Auto-generated on behalf of Manager NEM Real Time Operations
RESERVE NOTICE MT PASA PUBLICATION 31 MAY 2016
The MT PASA RELIABILITY_LRC results published on 31 May 2016 forecast shows low reserve conditions (LRC) in South Australia for Summer 2016-17 and Summer 2017-18. AEMO will continue to monitor the situation and take appropriate actions, if necessary.
The MT PASA results for the next 12 months are summarised at:
http://www.aemo.com.au/Electricity/Data/Forecast-Supply-and-Demand/Medium-Term-Outlook
This notice supersedes Market Notice 53514 published on 24 May 2016.
Please find the following information on some key inputs used in MT PASA:
Static minimum reserve levels (MRLs) have been specified for QLD, NSW and TAS regions as follows:
QLD: 913 MW
NSW: -1564 MW
TAS: 144 MW
The following optimum shared minimum reserve levels between Victoria and South Australia regions have been specified:
VIC Reserve >= 205.00
5.88 * VIC Reserve + SA Reserve >= 1237.88
1.33 * VIC Reserve + SA Reserve >= 228.00
0.43 * VIC Reserve + SA Reserve >= -40.53
0.23 * VIC Reserve + SA Reserve >= -147.55
SA Reserve >= -368.00
In order to remain consistent with the calculation of the minimum reserve levels, the following interconnector headroom constraints (net import/export limit constraints) have also been applied in MT PASA:
QLD: 0 MW of maximum net import into QLD.
NSW: 330 MW of minimum net export from NSW.
VIC: 940MW of maximum net import into VIC.
SA: 0 MW of maximum net import into SA.
Demand Side Participation included in MT PASA are:
Summer: QLD 156 MW, NSW 422 MW, VIC 245 MW, SA 167 MW and TAS 73 MW
Winter: QLD 156 MW, NSW 422 MW, VIC 185 MW, SA 167 MW and TAS 73 MW
Supply Planning
AEMO
NON-CONFORMANCE Region NSW1 Tuesday, 31 May 2016
NON-CONFORMANCE NSW1 Region Tuesday, 31 May 2016
AEMO declared a schedule generating unit non-conforming
Unit: MP2
Duration: 31/05/2016 11:40 to 31/05/2016 11:55
Amount: -31 MW
Constraint: NC-N_MP2
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Tuesday, 31 May 2016
NON-CONFORMANCE QLD1 Region Tuesday, 31 May 2016
AEMO declared a schedule generating unit non-conforming
Unit: BRAEMAR2
Duration: 31/05/2016 07:30 to 31/05/2016 07:45
Amount: -13 MW
Constraint: NC-Q_BRAEMAR2
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Tuesday, 31 May 2016
NON-CONFORMANCE QLD1 Region Tuesday, 31 May 2016
AEMO declared a schedule generating unit non-conforming
Unit: BRAEMAR1
Duration: 31/05/2016 07:15 to 31/05/2016 07:45
Amount: -13 MW
Constraint: NC-Q_BRAEMAR1
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region VIC1 Tuesday, 31 May 2016
NON-CONFORMANCE VIC1 Region Tuesday, 31 May 2016
AEMO declared a schedule generating unit non-conforming
Unit: HWPS3
Duration: 31/05/2016 00:45 to 31/05/2016 00:50
Amount: 10 MW
Constraint: NC-V_HWPS3
Auto-generated on behalf of Manager NEM Real Time Operations