Timeline
-
Consultation paper published5 July 2024
-
Submissions due on consultation paper2 August 2024
-
Draft report published23 Sep 2024
-
Submissions due on draft report22 Oct 2024
-
Final report published02 Dec 2024
AEMO’s indicative process and timeline for this consultation are outlined above. Future dates may be adjusted and additional steps may be included if necessary, as the consultation progresses. In the event that these dates change, AEMO will clearly identify the timetable on this webpage for this consultation.
Matter under consultation
The National Electricity Rules (NER) require AEMO to calculate and publish, each year, inter-regional loss factor equations and intra-regional loss factors. AEMO has developed the Forward-looking Transmission Loss Factor (FLLF) methodology (often referred to as the Marginal Loss Factor (MLF) methodology) to set out the process by which these factors are determined. Within the scope permitted by the NER, AEMO can amend the FLLF methodology by following the standard rules consultation procedure described in NER 8.9.2.
Draft report
-
17/10/2024
Draft Report Presentation
1.38 MB -
23/09/2024
MLF Draft Report
555.74 KB -
23/09/2024
Forward Looking Transmission Loss Factors Methodology v9.0_draft
Please note that, to aid readability, the draft methodology mark-up does not show formatting changes or minor wording changes that do not affect meaning.
560.81 KB