Integrating Energy Storage Systems into the NEM: Retail Electricity Market Procedures consultation

18/09/2023
Market National Electricity Market
StageFinal Report
ConvenorAEMO NEM
Initiated09/06/2023
Accepting submissions?No

On 2 December 2021, the Australian Energy Market Commission (AEMC) made a final determination to implement the National Electricity Amendment (Integrating energy storage systems into the National Electricity Market (NEM)) Rule 2021, referred to as the ‘IESS Rule’. The IESS Rule seeks to better integrate storage and hybrid systems, taking a significant step toward a technology agnostic two-way market model for the NEM and delivering extensive changes to registration and classification, dispatch arrangements, non-energy cost recovery, and participation of aggregated portfolios of small resources.

AEMO has concluded its consultation on the Retail Electricity Market Procedures for the IESS Rule change.  In addition to the IESS changes, the Final Determination also includes two Issue Change Forms (ICFs) raised through the Electricity Retail Consultative Forum (ERCF).

The Final Determination has introduced three new National Metering Identifier (NMI) Classification Codes and several amendments to existing NMI Classification Codes to identify integrated resource system connection points and differentiate between distribution and transmission generator connections. These changes will enable AEMO to appropriately allocate unaccounted for energy, market fees, and monitor the integrity of the market. A large number of terminology changes have also been applied to the Procedures as part of the rule change.

Two ICFs were also considered as part of the consultation. The final decision for ICF 070 will provide participants with greater locational information for NMIs in MSATS, improving industry efficiency, especially in regard to metering installation works. The substantive matter of ICF 059 to identify generation capability in MSATS will be consulted on separately. A minor change will be applied to the Customer Threshold Code to provide guidance to participants when searching for the relevant jurisdictional threshold. 

This consultation was consulted in accordance with the Rules consultation requirements detailed in clause 8.9 of the National Electricity Rules.

For queries, please contact: NEM.Retailprocedureconsultations@aemo.com.au.

  • First stage
  • Second stage
  • Final stage

The procedures under consultation are:

 Procedure Type of change Proposed effective date

IESS Rule

Retail Electricity Market Procedures - Glossary and Framework
Amendment for IESS Rule
2 June 2024
MSATS Procedures: CATS Procedure Principles and Obligations
Amendment for IESS Rule
2 June 2024
MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample (WIGS) NMIs
Amendment for IESS Rule
2 June 2024
Metrology Procedure Part A: Metering Data Validation, Substitution and Estimation
Amendment for IESS Rule
2 June 2024
Metrology Procedure Part B: Metering Data Validation, Substitution and Estimation
Amendment for IESS Rule
2 June 2024
Standing Data for MSATS document
Amendment for IESS Rule
2 June 2024
MSATS Procedures: Metering Data Management Procedures
Amendment for IESS Rule  2 June 2024
Exemption Procedure: Metering Installation Data Storage Requirements
Amendment for IESS Rule
2 June 2024
Guide to the Role of the Metering Coordinator
Amendment for IESS Rule
2 June 2024
Service Level Procedure: Metering Data Provider Services
Amendment for IESS Rule
2 June 2024
MSATS Procedures: National Metering Identifier
Amendment for IESS Rule
2 June 2024

 ICF_070

"ICF_070 Increase Building Name Field in MSATS”, will not be proceeding and has been removed. ICF_078 replaces ICF_070, incorporating a more comprehensive review of the NEM addressing elements. Consultation for ICF_078 is expected to commence in late May 2024. 

 

ICF_059

MSATS Procedures: CATS Procedure Principles and Obligations
Amendment for ICF_059
1 November 2023

The amended procedures are:

 Procedure Type of change Proposed
effective date
Links 

IESS Rule

 
Retail Electricity Market Procedures - Glossary and Framework
Amendment for IESS Rule
2 June 2024

Changes marked

Clean

MSATS Procedures: CATS Procedure Principles and Obligations
Amendment for IESS Rule
2 June 2024

Changes marked

Clean

MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample (WIGS) NMIs
Amendment for IESS Rule
2 June 2024

Changes marked

Clean

Metrology Procedure Part A: Metering Data Validation, Substitution and Estimation
Amendment for IESS Rule
2 June 2024
Changes marked

Clean

Metrology Procedure Part B: Metering Data Validation, Substitution and Estimation
Amendment for IESS Rule
2 June 2024

Changes marked

Clean

Standing Data for MSATS document
Amendment for IESS Rule
2 June 2024

Changes marked

Clean

MSATS Procedures: Metering Data Management Procedures
Amendment for IESS Rule  2 June 2024
Changes marked

Clean

Exemption Procedure: Metering Installation Data Storage Requirements
Amendment for IESS Rule
2 June 2024

Changes marked

Clean

Guide to the Role of the Metering Coordinator
Amendment for IESS Rule
2 June 2024

Changes marked

Clean

Service Level Procedure: Metering Data Provider Services
Amendment for IESS Rule
2 June 2024

Changes marked

Clean

MSATS Procedures: National Metering Identifier
Amendment for IESS Rule
2 June 2024

Changes marked

Clean

 ICF_070

 
"ICF_070 Increase Building Name Field in MSATS”, will not be proceeding and has been removed. ICF_078 replaces ICF_070, incorporating a more comprehensive review of the NEM addressing elements. Consultation for ICF_078 is expected to commence in late May 2024. 

   

ICF_059

 
MSATS Procedures: CATS Procedure Principles and Obligations
Amendment for ICF_059
1 November 2023

Changes marked

Clean