Filter by category
Filter by Date
[EventId:202507251705_confirmed] Prices for interval 25-Jul-2025 17:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1710 hrs on 25 July 2025
PRICES ARE NOW CONFIRMED for trading interval 25-Jul-2025 17:05.
In accordance with Market Notice 128323 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202507251700_confirmed] Prices for interval 25-Jul-2025 17:00 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1710 hrs on 25 July 2025
PRICES ARE NOW CONFIRMED for trading interval 25-Jul-2025 17:00.
In accordance with Market Notice 128322 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202507251655_confirmed] Prices for interval 25-Jul-2025 16:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1710 hrs on 25 July 2025
PRICES ARE NOW CONFIRMED for trading interval 25-Jul-2025 16:55.
In accordance with Market Notice 128321 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202507251650_confirmed] Prices for interval 25-Jul-2025 16:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1710 hrs on 25 July 2025
PRICES ARE NOW CONFIRMED for trading interval 25-Jul-2025 16:50.
In accordance with Market Notice 128320 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 128311
The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 27/07/2025.
The direction update is issued at 1700 hrs 25/07/2025.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 28/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 128313 is cancelled at 1400 hrs 25/07/2025.
No LOR condition is currently forecast in the STPASA period.
AEMO Operations
Cancellation: Reclassification of non-credible contingency event due to existence of widespread abnormal condition/s - SA region.
AEMO considers the occurrence of a non-credible contingency event due to the widespread abnormal conditions advised in AEMO Electricity Market Notice 128312 is no longer reasonably possible and accordingly its classification has reverted to non-credible.
Cancellation time: 1330 hrs 25/07/2025
Constraint set(s) revoked: I-VS_250
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0400 hrs 26/07/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 28/07/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
From 0730 hrs to 0900 hrs 28/07/2025.
The forecast capacity reserve requirement is 563 MW.
The minimum capacity reserve available is 536 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations