PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 18/06/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127638 is cancelled at 1412 hrs 17/06/2025.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 18/06/2025
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 127646 is cancelled at 1411 hrs 17/06/2025.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 18/06/2025
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 127637 is cancelled at 1410 hrs 17/06/2025.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 18/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Period:
[1.] From 1800 hrs 18/06/2025 to 1930 hrs 18/06/2025.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 508 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 18/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the VIC region for the following Period:
[1.] From 1800 hrs 18/06/2025 to 1900 hrs 18/06/2025.
The forecast capacity reserve requirement is 1166 MW.
The minimum capacity reserve available is 1069 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 18/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Periods:
[1.] From 1700 hrs 18/06/2025 to 1730 hrs 18/06/2025.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1305 MW.
[2.] From 1900 hrs 18/06/2025 to 2030 hrs 18/06/2025.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 955 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 18/06/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 18/06/2025 to 1900 hrs 18/06/2025.
The forecast capacity reserve requirement is 938 MW.
The minimum capacity reserve available is 812 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 18/06/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1730 hrs to 1900 hrs 18/06/2025.
The forecast capacity reserve requirement is 1047 MW.
The minimum capacity reserve available is 957 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
Cancellation of a Non-Credible Contingency Event: Kamerunga - Barron Gorge 7184 132kV line and Kamerunga - Barron Gorge 7143 132kV line in QLD1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: QLD1
Lines: Kamerunga - Barron Gorge 7184 132kV and Kamerunga - Barron Gorge 7143 132kV
Cancellation time: 17/06/2025 06:54
Constraint set(s) revoked:
NONE
Refer AEMO Electricity Market Notice 127609
Auto-generated on behalf of Manager NEM Real Time Operations