Market Notices

127940RESERVE NOTICE04/07/2025 01:54:12 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 12/07/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

1. From 0000 hrs to 0230 hrs 12/07/2025.
The forecast capacity reserve requirement is 230 MW.
The minimum capacity reserve available is 181 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
     
127934RESERVE NOTICE04/07/2025 12:42:28 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 06/07/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127931 is cancelled at 1200 hrs 04/07/2025.

No LOR2 condition is currently forecast in the STPASA period.

AEMO Operations
     
127933MARKET INTERVENTION04/07/2025 11:10:32 AM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 127930

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2200 hrs 04/07/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1400 hrs 04/07/2025, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
     
127932MARKET INTERVENTION04/07/2025 11:09:52 AM

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer to Market Notice 127929

The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 1600 hrs 04/07/2025.

The direction update is issued at 1110 hrs 04/07/2025.

Manager NEM Real Time Operations
     
127931RESERVE NOTICE04/07/2025 11:08:47 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 06/07/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

1. From 0930 hrs to 1100 hrs 06/07/2025.
The forecast capacity reserve requirement is 743 MW.
The minimum capacity reserve available is 695 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
     
127930MARKET INTERVENTION04/07/2025 07:04:10 AM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2200 hrs 04/07/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
127929MARKET INTERVENTION03/07/2025 03:59:21 PM

Direction - SA region to AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region to AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer to Market Notice 127926


In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN at 1600 hrs 03/07/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 0900 hrs 04/07/2025
Services provided: Voltage Control
Circumstances necessitating the Direction:Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1500 hrs 04/07/2025

AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
     
127928MARKET INTERVENTION03/07/2025 03:59:26 PM

Direction - SA region 03/07/2025

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region 03/07/2025

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1605 hrs on 03/07/2025.

Intervention pricing does not apply to this AEMO intervention event.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.


Manager NEM Real Time Operations
     
127927RESERVE NOTICE03/07/2025 02:41:51 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 07/07/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

1. From 1730 hrs to 2000 hrs 07/07/2025.
The forecast capacity reserve requirement is 1558 MW.
The minimum capacity reserve available is 1313 MW.

AEMO Operations
     