Filter by category
Filter by Date
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 11/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 128031 is cancelled at 0025 hrs 09/07/2025.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 11/07/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
[1.] From 1000 hrs 11/07/2025 to 1030 hrs 11/07/2025.
The forecast capacity reserve requirement is 833 MW.
The minimum capacity reserve available is 819 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
[EventId:202507081830_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 08 July 2025 18:30
Issued by Australian Energy Market Operator Ltd at 1830 hrs on 8 July 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 July 2025.
Refer to market notice: 128028
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1830 hrs on 8 July 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202507081730_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 08 July 2025 17:30
Issued by Australian Energy Market Operator Ltd at 1730 hrs on 8 July 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 July 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1730 hrs on 8 July 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Electricity Market Management System_PreProd
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Normal
Service/Component: Electricity Market Management System_PreProd
Change Title: Update Shareplex NuTCracker resource allocation
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 09/10/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 128005 is cancelled at 1000hrs 08/07/2025.
No LOR2 condition is currently forecast in the STPASA period.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 09/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 128001 has been updated at 0900 hrs 08/07/2025 to the following:
From 2230 hrs to 2330 hrs 09/07/2025.
The forecast capacity reserve requirement is 566 MW.
The minimum capacity reserve available is 573 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 128002 is cancelled at 0900 hrs 08/07/2025.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127994 has been updated to the following:
[1.] From 0000 hrs 10/07/2025 to 0100 hrs 10/07/2025.
The forecast capacity reserve requirement is 629 MW.
The minimum capacity reserve available is 596 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations