STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 18/06/2025
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 127604 is cancelled at 1700 hrs 16/06/2025.
No LOR2 condition is currently forecast in the STPASA period.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 18/06/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
1. From 0700 hrs to 0830 hrs 18/06/2025.
The forecast capacity reserve requirement is 1086 MW.
The minimum capacity reserve available is 896 MW.
2. From 1630 hrs to 1700 hrs 18/06/2025.
The forecast capacity reserve requirement is 1128 MW.
The minimum capacity reserve available is 922 MW.
3. From 1730 hrs to 1900 hrs 18/06/2025.
The forecast capacity reserve requirement is 1167 MW.
The minimum capacity reserve available is 1135 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127598 is cancelled at 1410 hrs 16/06/2025.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Period:
[1.] From 1730 hrs 17/06/2025 to 1800 hrs 17/06/2025.
The forecast capacity reserve requirement is 292 MW.
The minimum capacity reserve available is 230 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/06/2025
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 127577 is cancelled at 1200 hrs 16/06/2025.
No LOR2 condition is currently forecast in the STPASA period.
AEMO Operations
[EventId:202506161145_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 16 June 2025 11:45
Issued by Australian Energy Market Operator Ltd at 1145 hrs on 16 June 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 16 June 2025.
Refer to market notice: 127594
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1145 hrs on 16 June 2025.
This is an AEMO autogenerated Market Notice.
NON-CONFORMANCE Region VIC1 Monday, 16 June 2025
NON-CONFORMANCE VIC1 Region Monday, 16 June 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MOKOSF1
Duration: 16/06/2025 11:20 to 16/06/2025 11:30
Amount: 30 MW
Constraint: NC-V_MOKOSF1
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:202506161105_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 16 June 2025 11:05
Issued by Australian Energy Market Operator Ltd at 1105 hrs on 16 June 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 16 June 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1105 hrs on 16 June 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
NON-CONFORMANCE Region VIC1 Monday, 16 June 2025
NON-CONFORMANCE VIC1 Region Monday, 16 June 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MOKOSF1
Duration: 16/06/2025 10:15 to 16/06/2025 10:45
Amount: 12 MW
Constraint: NC-V_MOKOSF1