Reclassification of non-credible contingency event due to existence of widespread abnormal condition/s - SA region.
AEMO has identified that a non-credible contingency event impacting the power system is more likely to occur and is considered reasonably possible because of the existence of widespread abnormal conditions namely severe weather in the SA region.
AEMO has therefore reclassified the occurrence of a non-credible contingency event involving multiple plant due to these abnormal conditions as credible.
AEMO has taken the following action to maintain power system security at 1750 hrs 24/06/2025.
Constraint set invoked:
I-VS_250
Duration: 1750 hrs until further notice
Need for further measures is being monitored and further measures may be implemented in line with the Power System Security Guidelines (SO_OP_3715).
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Tungatinah-Lake Echo-Waddamana 1 110kV line and Tungatinah-Waddamana 2 110kV line in TAS1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: TAS1
Lines: Tungatinah-Lake Echo-Waddamana 1 110kV and Tungatinah-Waddamana 2 110kV
Duration: 24/06/2025 17:33 until further notice
Constraint set(s) invoked:
T-TUWA12_110_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
Cancellation: Reclassification of non-credible contingency event due to existence of widespread abnormal conditions - SA region.
AEMO considers the occurrence of a non-credible contingency event due to the widespread abnormal conditions advised in AEMO Electricity Market Notice 127779 is no longer reasonably possible and accordingly its classification has reverted to non-credible.
Cancellation time: 1725 hrs 24/06/2025
Constraint set(s) revoked:
I-VS_250
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 01/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127811 has been updated at 1600 hrs 24/06/2025 to the following:
1. From 0400 hrs to 1100 hrs 01/07/2025.
The forecast capacity reserve requirement is 226 MW.
The minimum capacity reserve available is 0 MW.
2. From 1630 hrs to 2359 hrs 01/07/2025.
The forecast capacity reserve requirement is 237 MW.
The minimum capacity reserve available is 0 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 01/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127781 has been updated at 1500 hrs 24/06/2025 to the following:
1. From 0400 hrs to 1100 hrs 01/07/2025.
The forecast capacity reserve requirement is 230 MW.
The minimum capacity reserve available is 106 MW.
2. From 1630 hrs to 2359 hrs 01/07/2025.
The forecast capacity reserve requirement is 237 MW.
The minimum capacity reserve available is 84 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 30/06/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127776 is cancelled at 1500 hrs 24/06/2025.
AEMO Operations
Cancellation of a Non-Credible Contingency Event: Palmerston - Hadspen 3 & 4 110kV line and line in TAS1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: TAS1
Lines: Palmerston - Hadspen 3 & 4 110kV and
Cancellation time: 24/06/2025 15:19
Constraint set(s) revoked:
T-HAPM_110_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Refer AEMO Electricity Market Notice 127772
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:202506241455_confirmed] Prices for interval 24-Jun-2025 14:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1515 hrs on 24 June 2025
PRICES ARE NOW CONFIRMED for trading interval 24-Jun-2025 14:55.
In accordance with Market Notice 127791 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202506241515_confirmed] Prices for interval 24-Jun-2025 15:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1515 hrs on 24 June 2025
PRICES ARE NOW CONFIRMED for trading interval 24-Jun-2025 15:15.
In accordance with Market Notice 127802 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.