Initial - CHG0104496 - Planned Firewall maintenance in Brisbane
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: Local Area Network
Change Title: Planned Firewall maintenance in Brisbane
Change Start Date & Time: 09/08/2025 10:00:59
Change End Date & Time: 09/08/2025 16:00:59
Outage Start Date & Time:
Outage End Date & Time:
Environment: Production
Participant Impact and Requirements: The following impacts are expected to participant connectivity during this planned outage:
IPWAN Participants - No impact is expected
Lan-2-Lan VPN Participants (IPSEC) - Up to 4 hour outage for participants who have established their VPN connection/s via the AEMO QLD datacenter termination point (202.44.76.10 for Policy Based VPN's or 202.44.76.12 for Route Based VPN) only - All L2L connections should be established to both QLD / NSW.
Note: Participants are encouraged to ensure their VPN connections are already established or are configured (as per AEMO best practice) to automatically failover to the alternate AEMO NSW datacenter termination point (202.44.78.10 or 202.44.78.12) prior to this scheduled outage. *** Failure to do so will impact connectivity to Marketnet Services ***.
B2B VPN - No impact is expected.
SSL VPN Participants: None expected as DNS entry will be updated to remove QLD IP.
GASHUB: A brief interuption of up to 60 seconds while services are failover from QLD to NSW Datacenter.
Other Impacts will have been communicated in advance.
Support Information:
Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?id=pp_services_status for any planned/unplanned maintenance activities.
Initial - CHG0104998 - Telco Outage Notification - Telstra Norwest Indial (02 8884 5000-5999)
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: Cisco IP Phone
Change Title: Telco Outage Notification - Telstra Norwest Indial (02 8884 5000-5999)
Change Start Date & Time: 30/07/2025 00:00:00
Change End Date & Time: 30/07/2025 06:00:00
Outage Start Date & Time: 30/07/2025 00:00:00
Outage End Date & Time: 30/07/2025 06:00:00
Environment: Production
Participant Impact and Requirements: External/Market
Outage Duration:
1 x 10 minutes during the window
Impacts:
Reduced redundancy for Inbound and Outbound Calls (automatically rerouted via Brisbane).
Support Information:
Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?id=pp_services_status for any planned/unplanned maintenance activities.
Initial - CHG0104999 - Telco Outage Notification - Telstra Brisbane Indial (07 3347 XXXX-XXXX)
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: Cisco IP Phone
Change Title: Telco Outage Notification - Telstra Brisbane Indial (07 3347 XXXX-XXXX)
Change Start Date & Time: 30/07/2025 00:00:00
Change End Date & Time: 30/07/2025 06:00:00
Outage Start Date & Time: 30/07/2025 00:00:00
Outage End Date & Time: 30/07/2025 06:00:00
Environment: Production
Participant Impact and Requirements: External/Market
Outage Duration:
1 x 10 minutes during the window
Impacts:
Reduced redundancy for Inbound and Outbound Calls (automatically rerouted via Sydney).
Support Information:
Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?id=pp_services_status for any planned/unplanned maintenance activities.
[EventId:202507260900_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 26 July 2025 09:00
Issued by Australian Energy Market Operator Ltd at 0900 hrs on 26 July 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 26 July 2025.
Refer to market notice: 128358
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.
The negative residue constraint NRM_SA1_VIC1 ceased operating at 0900 hrs on 26 July 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202507260805_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 26 July 2025 08:05
Issued by Australian Energy Market Operator Ltd at 0805 hrs on 26 July 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 26 July 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.
The negative residue constraint set NRM_SA1_VIC1 commenced operating from 0805 hrs on 26 July 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202507252100_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 25 July 2025 21:00
Issued by Australian Energy Market Operator Ltd at 2100 hrs on 25 July 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 25 July 2025.
Refer to market notice: 128337
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 2100 hrs on 25 July 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202507251830_NRM_VIC1_NSW1_stopped] NEGRES CONSTRAINT NRM_VIC1_NSW1 ceased operating from 25 July 2025 18:30
Issued by Australian Energy Market Operator Ltd at 1830 hrs on 25 July 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 25 July 2025.
Refer to market notice: 128338
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to NSW directional interconnector.
The negative residue constraint NRM_VIC1_NSW1 ceased operating at 1830 hrs on 25 July 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202507251735_NRM_VIC1_NSW1_started] NEGRES CONSTRAINT NRM_VIC1_NSW1 started operating from 25 July 2025 17:35
Issued by Australian Energy Market Operator Ltd at 1735 hrs on 25 July 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 25 July 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to NSW directional interconnector.
The negative residue constraint set NRM_VIC1_NSW1 commenced operating from 1735 hrs on 25 July 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202507251735_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 25 July 2025 17:35
Issued by Australian Energy Market Operator Ltd at 1735 hrs on 25 July 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 25 July 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1735 hrs on 25 July 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.