Market Notices

127539RESERVE NOTICE14/06/2025 01:24:29 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 14/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:


[1.] From 1700 hrs 14/06/2025 to 1930 hrs 14/06/2025.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 691 MW.


Manager NEM Real Time Operations
     
127537RESERVE NOTICE14/06/2025 10:51:52 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127536 has been updated at 1012 hrs 14/06/2025 to the following:


[1.] From 0700 hrs 17/06/2025 to 0730 hrs 17/06/2025.
The forecast capacity reserve requirement is 581 MW.
The minimum capacity reserve available is 577 MW.

[2.] From 0800 hrs 17/06/2025 to 0900 hrs 17/06/2025.
The forecast capacity reserve requirement is 562 MW.
The minimum capacity reserve available is 530 MW.

[3.] From 0930 hrs 17/06/2025 to 1000 hrs 17/06/2025.
The forecast capacity reserve requirement is 562 MW.
The minimum capacity reserve available is 559 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
127536RESERVE NOTICE14/06/2025 08:58:13 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

[1.] From 0630 hrs 17/06/2025 to 0800 hrs 17/06/2025.
The forecast capacity reserve requirement is 552 MW.
The minimum capacity reserve available is 514 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
127534RESERVE NOTICE13/06/2025 03:11:22 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 127524 is cancelled at 1400 hrs 13/06/2025.

No LOR2 condition is currently forecast in the STPASA period.

AEMO Operations
     
127533RESERVE NOTICE13/06/2025 03:11:24 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 16/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 127532 is cancelled at 1400 hrs 13/06/2025.

No LOR2 condition is currently forecast in the STPASA period.

AEMO Operations
     
127532RESERVE NOTICE13/06/2025 11:52:07 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 16/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

From 0900 hrs to 1000 hrs 16/06/2025.
The forecast capacity reserve requirement is 845 MW.
The minimum capacity reserve available is 809 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
     
127524RESERVE NOTICE13/06/2025 08:59:08 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following periods:

1. From 1100 hrs to 1130 hrs 17/06/2025.
The forecast capacity reserve requirement is 220 MW.
The minimum capacity reserve available is 178 MW.

2. From 1400 hrs to 1430 hrs 17/06/2025.
The forecast capacity reserve requirement is 270 MW.
The minimum capacity reserve available is 236 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
     
127515RESERVE NOTICE12/06/2025 03:30:06 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 127495 is cancelled at 1400 hrs 12/06/2025.

No LOR condition is currently forecast in the STPASA period.

AEMO Operations
     
127500POWER SYSTEM EVENTS11/06/2025 06:05:55 PM

Update - Non-credible contingency event - QLD region - 11/06/2025

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - QLD region - 11/06/2025

Refer AEMO Electricity Market Notice 127499

At 1713 hrs the Belmont (H3) No.1 275 kV bus and Loganlea - Belmont (829) 275 kV line tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
     