Market Notices

127574MARKET INTERVENTION16/06/2025 08:40:28 AM

Cancellation - Possible intervention to manage power system security in South Australia (SA) region 16/06/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Possible intervention to manage power system security in South Australia (SA) region 16/06/2025

Refer Market Notice 127570

AEMO no longer foresees a possible requirement for intervention to manage power system security in SA region. The advice of possible intervention is cancelled from 0840 hrs 16/06/2025.

Manager NEM Real Time Operations
     
127573RESERVE NOTICE16/06/2025 07:15:27 AM

Cancellation of Actual (LOR1) condition in the QLD region - 16/06/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 16/06/2025

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.127572 is cancelled at 0715 hrs 16/06/2025.

Manager NEM Real Time Operations
     
127572RESERVE NOTICE16/06/2025 06:44:29 AM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 16/06/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 16/06/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 0630 hrs.
The Actual LOR1 condition is forecast to exist until 0730 hrs

The capacity reserve requirement is 700 MW
The minimum capacity reserve available is 638 MW

Manager NEM Real Time Operations
     
127571RESERVE NOTICE16/06/2025 05:49:20 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127565 has been updated at 0545 hrs 16/06/2025 to the following:

[1.] From 0630 hrs 17/06/2025 to 1130 hrs 17/06/2025.
The forecast capacity reserve requirement is 335 MW.
The minimum capacity reserve available is 267 MW.

[2.] From 1500 hrs 17/06/2025 to 1800 hrs 17/06/2025.
The forecast capacity reserve requirement is 312 MW.
The minimum capacity reserve available is 279 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
127570MARKET INTERVENTION16/06/2025 05:48:59 AM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2230 hrs 16/06/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
127565RESERVE NOTICE15/06/2025 10:45:39 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127559 has been updated at 2245 hrs 15/06/2025 to the following:

[1.] From 0600 hrs 17/06/2025 to 1800 hrs 17/06/2025.
The forecast capacity reserve requirement is 496 MW.
The minimum capacity reserve available is 282 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
127561RESERVE NOTICE15/06/2025 02:33:35 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 127556 has been updated at 1415 hrs 15/06/2025 to the following:


[1.] From 1100 hrs 17/06/2025 to 1130 hrs 17/06/2025.
The forecast capacity reserve requirement is 765 MW.
The minimum capacity reserve available is 696 MW.

[2.] From 1400 hrs 17/06/2025 to 1430 hrs 17/06/2025.
The forecast capacity reserve requirement is 749 MW.
The minimum capacity reserve available is 629 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
127559RESERVE NOTICE15/06/2025 02:25:14 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127546 has been updated at 1415 hrs 15/06/2025 to the following:

[1.] From 0730 hrs 17/06/2025 to 1030 hrs 17/06/2025.
The forecast capacity reserve requirement is 554 MW.
The minimum capacity reserve available is 414 MW.

[2.] From 1500 hrs 17/06/2025 to 1800 hrs 17/06/2025.
The forecast capacity reserve requirement is 418 MW.
The minimum capacity reserve available is 383 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
127558MARKET INTERVENTION15/06/2025 03:59:18 PM

Direction - SA region to AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region to AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer to Market Notice 127557


In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN at 1600 hrs 15/06/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 2300 hrs 15/06/2025
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: The synchronous generating units currently expected to be synchronised in SA will be inadequate to maintain sufficient Voltage Control in SA. Intervention is required to maintain the power system in a secure operating state
Expected duration: 1500 hrs 16/06/2025.

AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
     