STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127545 has been updated at 2250 hrs 14/06/2025 to the following:
[1.] From 0600 hrs 17/06/2025 to 1800 hrs 17/06/2025.
The forecast capacity reserve requirement is 529 MW.
The minimum capacity reserve available is 392 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127541 has been updated at 2045 hrs 14/06/2025 to the following:
[1.] From 0600 hrs 17/06/2025 to 1000 hrs 17/06/2025.
The forecast capacity reserve requirement is 584 MW.
The minimum capacity reserve available is 503 MW.
[2.] From 1530 hrs 17/06/2025 to 1600 hrs 17/06/2025.
The forecast capacity reserve requirement is 535 MW.
The minimum capacity reserve available is 513 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/06/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
[1.] From 1400 hrs 17/06/2025 to 1430 hrs 17/06/2025.
The forecast capacity reserve requirement is 801 MW.
The minimum capacity reserve available is 740 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the QLD region - 14/06/2025
Cancellation of Actual (LOR1) condition in the QLD region - 14/06/2025
The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.127542 is cancelled at 1808 hrs 14/06/2025.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 14/06/2025
Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 14/06/2025
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1800 hrs
The capacity reserve requirement is 730 MW
The minimum capacity reserve available is 724 MW
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127537 has been updated at 1715 hrs 14/06/2025 to the following:
[1.] From 0600 hrs 17/06/2025 to 1000 hrs 17/06/2025.
The forecast capacity reserve requirement is 620 MW.
The minimum capacity reserve available is 514 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 14/06/2025
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 127539 is cancelled at 1712 hrs 14/06/2025.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 14/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1700 hrs 14/06/2025 to 1930 hrs 14/06/2025.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 691 MW.
Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Saturday, 14 June 2025
NON-CONFORMANCE QLD1 Region Saturday, 14 June 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: YARANSF1
Duration: 14/06/2025 11:10 to 14/06/2025 12:05
Amount: 67 MW
Constraint: NC-Q_YARANSF1
Auto-generated on behalf of Manager NEM Real Time Operations