The Draft 2020 ISP consultation ran from 12 December 2019 to 21 February 2020. A total of 54 submissions were received, of which 5 were confidential.
Non-confidential stakeholder submissions are provided below. Responses to this consultation are summarised in the Consultation Summary Report, see link below.
Draft 2020 ISP Consultation Summary Report
Submissions
-
03/03/2020
Paul Matthews
1.4 MB -
03/03/2020
Powerlink Queeensland
6.15 MB -
03/03/2020
Public Interest Advocacy Centre
168.79 KB -
03/03/2020
RES Australia
604.21 KB -
03/03/2020
Smart Wires
218.69 KB -
03/03/2020
Star of the South
322.33 KB -
03/03/2020
TasNetworks
761.32 KB -
03/03/2020
Tesla Energy
647.2 KB -
03/03/2020
University of New South Wales
118.14 KB -
03/03/2020
UPC AC Renewables
2.76 MB -
03/03/2020
Walcha Energy
1.04 MB -
03/03/2020
WestWind Energy
148.37 KB -
03/03/2020
Winwick Submission
168.58 KB -
03/03/2020
Winwick Attachment
446.58 KB