AEMO established the Systems Working Group to seek input from the industry on the design of system and interface changes required to support Five-Minute Settlement (5MS) and Global Settlement (GS).
The SWG worked closely with the Procedures Working Group (PWG) to ensure systems were aligned with the rules and procedure changes.
As 5MS and GS implementation progressed, the SWG fed into the Readiness Working Group (RWG) and received feedback from the RWG in relation to proposed technical specifications and systems approaches.
The records below are for reference purposes, including Terms of Reference, Meeting Packs and Meeting Notes.
Terms of reference
Records of Systems Working Group meetings
-
19/08/2019
5MS SWG - meeting 13 - pack
909.03 KB -
19/08/2019
5MS SWG - meeting 13 - notes
197.83 KB -
15/07/2019
5MS SWG - meeting 12 - pack
1.3 MB -
15/07/2019
5MS SWG - meeting 12 - notes
316.81 KB -
17/06/2019
5MS SWG - meeting 11 - pack
1.51 MB -
17/06/2019
5MS SWG - meeting 11 - notes
187.07 KB -
20/05/2019
5MS SWG - meeting 10 - pack
1.67 MB -
20/05/2019
5MS SWG - meeting 10 - notes
174.6 KB -
15/04/2019
5MS SWG - meeting 9 - pack
1.58 MB -
15/04/2019
5MS SWG - meeting 9 - notes
177.5 KB