Filter by category
Filter by Date
[EventId:202503171650_review] Prices for interval 17-Mar-2025 16:50 are subject to review
Issued by Australian Energy Market Operator Ltd at 1645 hrs on 17 March 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 17-Mar-2025 16:50.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202503171640_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 17 March 2025 16:40
Issued by Australian Energy Market Operator Ltd at 1640 hrs on 17 March 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 17 March 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1640 hrs on 17 March 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202503171645_review] Prices for interval 17-Mar-2025 16:45 are subject to review
Issued by Australian Energy Market Operator Ltd at 1640 hrs on 17 March 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 17-Mar-2025 16:45.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202503171640_review] Prices for interval 17-Mar-2025 16:40 are subject to review
Issued by Australian Energy Market Operator Ltd at 1635 hrs on 17 March 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 17-Mar-2025 16:40.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202503171635_review] Prices for interval 17-Mar-2025 16:35 are subject to review
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 17 March 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 17-Mar-2025 16:35.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202503171630_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 17 March 2025 16:30
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 17 March 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 17 March 2025.
Refer to market notice: 125753
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1630 hrs on 17 March 2025.
This is an AEMO autogenerated Market Notice.
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 125755
Direction is cancelled from: 1730 hrs 17/03/2025
Manager NEM Real Time Operations
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 125710
The PPCCGT PELICAN POINT direction is now expected to stay in place until 1730 hrs 17/03/2025.
The direction update is issued at 1620 hrs 17/03/2025.
Manager NEM Real Time Operations
RESERVE NOTICE MT PASA 18 March 2025
MT PASA provides early information to the market on potential reliability issues, enabling the market to respond proactively and potentially avoid the need for AEMO intervention.
For further information, please refer to:
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data/Market-Management-System-MMS/Projected-Assessment-of-System-Adequacy
This notice supersedes Market Notice 125525 published on 11 March 2025.
Background
As part of a broader process of implementing the reliability standard, AEMO runs the Medium Term Projected Assessment of System Adequacy (MTPASA) process weekly to forecast expected unserved energy levels over a two year period. If the expected annual unserved energy exceeds the maximum level specified by the Reliability Standard, a Low Reserve Condition is identified.
For more information about how AEMO implements the reliability standard, please view the Reliability Standard Implementation Guidelines (RSIG) available on AEMO's website at https://www.aemo.com.au/Electricity/National
Forecasting
AEMO