101153RECLASSIFY CONTINGENCY18/08/2022 01:09:40 PM

Cancellation of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: TAS1

Lines: Farrell - Reece No.1 220 kV and Farrell - Reece No.2 220 kV

Cancellation time: 18/08/2022 13:09

Constraint set(s) revoked:
F-T-FARE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1


Refer AEMO Electricity Market Notice 101151

Auto-generated on behalf of Manager NEM Real Time Operations
     
101152RESERVE NOTICE18/08/2022 12:48:22 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 21/08/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 101150 is cancelled at 1200 hrs 18/08/2022.

No LOR2 condition is currently forecast in the STPASA period.

AEMO Operations
     
101151RECLASSIFY CONTINGENCY18/08/2022 12:04:20 PM

Reclassification of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS1

Lines: Farrell - Reece No.1 220 kV and Farrell - Reece No.2 220 kV

Duration: 18/08/2022 12:04 until further notice

Constraint set(s) invoked:
F-T-FARE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1


Auto-generated on behalf of Manager NEM Real Time Operations
     
101150RESERVE NOTICE18/08/2022 11:34:37 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 21/08/2022

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

From 0600 hrs to 0700 hrs 21/08/2022.
The forecast capacity reserve requirement is 816 MW.
The minimum capacity reserve available is 806 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
     
101149RESERVE NOTICE18/08/2022 11:08:35 AM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 23/08/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 101145 is cancelled at 1000 hrs 18/08/2022.

No LOR2 condition is currently forecast in the STPASA period.

AEMO Operations
     
101148RESERVE NOTICE18/08/2022 07:31:57 AM

Cancellation of Actual (LOR1) condition in the QLD region - 18/08/2022

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 18/08/2022

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.101147 is cancelled at 0730 hrs 18/08/2022.

Manager NEM Real Time Operations
     
101147RESERVE NOTICE18/08/2022 06:51:42 AM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 18/08/2022

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 18/08/2022

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 0630 hrs.

The Actual LOR1 condition is forecast to exist until 0730 hrs.
The forecast capacity reserve requirement is 639 MW.
The minimum capacity reserve available is 566 MW.

Manager NEM Real Time Operations
     
101145RESERVE NOTICE18/08/2022 05:45:43 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 23/08/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

[1.] From 1830 hrs 23/08/2022 to 2030 hrs 23/08/2022.
The forecast capacity reserve requirement is 250 MW.
The minimum capacity reserve available is 211 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
101144RESERVE NOTICE17/08/2022 11:28:20 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 24/08/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 101142 is cancelled at 2315 hrs 17/08/2022.

No LOR2 condition is currently forecast in the STPASA period.

Manager NEM Real Time Operations
     