Non-credible contingency event - NSW region - 17/01/2025
Non-credible contingency event - NSW region - 17/01/2025
At 0825 hrs the Buronga 330 kV B Bus tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Non-credible contingency event - NSW region - 15/01/2025
Non-credible contingency event - NSW region - 15/01/2025
At 2019 hrs the Tomago - Taree (963) 132kV line and the Tomago - Brandy Hill (96C) 132kV line tripped.
AEMO did not instruct load shedding.
AEMO has been advised of disconnection of 80 MW of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.