127650RESERVE NOTICE17/06/2025 02:24:42 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 18/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the VIC region advised in AEMO Electricity Market Notice No. 127645 is cancelled at 1412 hrs 17/06/2025.

Manager NEM Real Time Operations
     
127649RESERVE NOTICE17/06/2025 02:24:42 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 18/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127638 is cancelled at 1412 hrs 17/06/2025.

Manager NEM Real Time Operations
     
127648RESERVE NOTICE17/06/2025 02:26:23 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 18/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 127646 is cancelled at 1411 hrs 17/06/2025.

Manager NEM Real Time Operations
     
127646RESERVE NOTICE17/06/2025 01:06:41 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 18/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Period:


[1.] From 1800 hrs 18/06/2025 to 1930 hrs 18/06/2025.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 508 MW.


Manager NEM Real Time Operations
     
127645RESERVE NOTICE17/06/2025 01:06:29 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 18/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the VIC region for the following Period:


[1.] From 1800 hrs 18/06/2025 to 1900 hrs 18/06/2025.
The forecast capacity reserve requirement is 1166 MW.
The minimum capacity reserve available is 1069 MW.


Manager NEM Real Time Operations
     
127638RESERVE NOTICE17/06/2025 01:06:26 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 18/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Periods:


[1.] From 1700 hrs 18/06/2025 to 1730 hrs 18/06/2025.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1305 MW.


[2.] From 1900 hrs 18/06/2025 to 2030 hrs 18/06/2025.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 955 MW.


Manager NEM Real Time Operations
     
127626GENERAL NOTICE17/06/2025 01:30:24 PM

Planned outage of Moorabool - Cressy No 1 500 kV line in the VIC region on 19/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Moorabool - Cressy No 1 500 kV line in the Victoria (VIC) region is planned to be out of service from 0600 hrs to 1700 hrs on 19/06/2025.

A credible contingency event during this planned outage could cause synchronous separation of the South Australia (SA) region from the rest of the NEM.

During this planned outage:

* Power transfer will be restricted across the VIC - SA interconnector (Heywood interconnector); and
* Post contingent FCAS will be sourced within SA following Separation event.

Refer AEMO Network Outage Schedule (NOS) for further details.

AEMO Operations
     
127601RESERVE NOTICE16/06/2025 02:13:45 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 127599 is cancelled at 1410 hrs 16/06/2025.

Manager NEM Real Time Operations
     
127599RESERVE NOTICE16/06/2025 01:28:23 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

[1.] From 1700 hrs 17/06/2025 to 1730 hrs 17/06/2025.
The forecast capacity reserve requirement is 450 MW.
The minimum capacity reserve available is 389 MW.

[2.] From 1800 hrs 17/06/2025 to 2130 hrs 17/06/2025.
The forecast capacity reserve requirement is 633 MW.
The minimum capacity reserve available is 478 MW.

Manager NEM Real Time Operations
     