127554MARKET INTERVENTION15/06/2025 01:18:52 PM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 127551

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2300 hrs 15/06/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1600 hrs 15/06/2025, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
     
127551MARKET INTERVENTION15/06/2025 06:53:11 AM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2300 hrs 15/06/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
127550MARKET INTERVENTION15/06/2025 04:00:22 AM

Cancellation - AEMO Intervention Event - SA region 12/06/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - SA region 12/06/2025

Refer to Market Notice 127518

The AEMO Intervention Event and all associated directions are cancelled from 0400 hrs on 15/06/2025.


Manager NEM Real Time Operations
     
127549MARKET INTERVENTION15/06/2025 04:00:09 AM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer to Market Notice 127535

Direction is cancelled from: 0400 hrs 15/06/2025

Manager NEM Real Time Operations
     
127543RESERVE NOTICE14/06/2025 06:10:33 PM

Cancellation of Actual (LOR1) condition in the QLD region - 14/06/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 14/06/2025

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.127542 is cancelled at 1808 hrs 14/06/2025.

Manager NEM Real Time Operations
     
127542RESERVE NOTICE14/06/2025 05:41:52 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 14/06/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 14/06/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1800 hrs

The capacity reserve requirement is 730 MW
The minimum capacity reserve available is 724 MW

Manager NEM Real Time Operations
     
127535MARKET INTERVENTION13/06/2025 04:00:11 PM

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer to Market Notice 127519

The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 15/06/2025.

The direction update is issued at 1600 hrs 13/06/2025.

Manager NEM Real Time Operations
     
127523RECLASSIFY CONTINGENCY13/06/2025 04:29:10 AM

Cancellation of a Non-Credible Contingency Event: Bayswater - Mt Piper No.5A3 500kV line and Wollar - Mt Piper No.5A5 500kV line in NSW1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: NSW1

Lines: Bayswater - Mt Piper No.5A3 500kV and Wollar - Mt Piper No.5A5 500kV

Cancellation time: 13/06/2025 04:29

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 127521

Auto-generated on behalf of Manager NEM Real Time Operations
     
127521RECLASSIFY CONTINGENCY13/06/2025 03:27:25 AM

Reclassification of a Non-Credible Contingency Event: Bayswater - Mt Piper No.5A3 500kV line and Wollar - Mt Piper No.5A5 500kV line in NSW1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: NSW1

Lines: Bayswater - Mt Piper No.5A3 500kV and Wollar - Mt Piper No.5A5 500kV

Duration: 13/06/2025 03:27 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
     