STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 30/06/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127853 has been updated at 1400 hrs 26/06/2025 to the following:
1. From 0700 hrs to 0800 hrs 30/06/2025.
The forecast capacity reserve requirement is 1558 MW.
The minimum capacity reserve available is 1355 MW.
2. From 1630 hrs to 2200 hrs 30/06/2025.
The forecast capacity reserve requirement is 1558 MW.
The minimum capacity reserve available is 1009 MW.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 30/06/2025
The Forecast LOR1 condition in the VIC region advised in AEMO Electricity Market Notice No. 127854 is cancelled at 1400 hrs 26/06/2025.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 02/07/2025
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 127858 has been updated at 1400 hrs 26/06/2025 to the following:
1. From 0700 hrs to 0900 hrs 02/07/2025.
The forecast capacity reserve requirement is 459 MW.
The minimum capacity reserve available is 443 MW.
2. From 1730 hrs to 2230 hrs 02/07/2025.
The forecast capacity reserve requirement is 466 MW.
The minimum capacity reserve available is 449 MW.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 03/07/2025
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 127859 is cancelled at 1400 hrs 26/06/2025.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 01/07/2025
The Forecast LOR1 condition in the VIC region advised in AEMO Electricity Market Notice No. 127860 is cancelled at 1400 hrs 26/06/2025.
AEMO Operations
NON-CONFORMANCE Region SA1 Thursday, 26 June 2025
NON-CONFORMANCE SA1 Region Thursday, 26 June 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: ADPBA1
Duration: 26/06/2025 07:40 to 26/06/2025 10:00
Amount: -6 MW
Constraint: NC-S_ADPBA1
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region VIC1 Wednesday, 25 June 2025
NON-CONFORMANCE VIC1 Region Wednesday, 25 June 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MRTLSWF1
Duration: 25/06/2025 16:05 to 25/06/2025 17:05
Amount: -67 MW
Constraint: NC-V_MRTLSWF1
Auto-generated on behalf of Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 02/07/2025
The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 127847 is cancelled at 1600 hrs on 25/06/2025.
No LOR3 condition is currently forecast in the STPASA period.
AEMO Operations
Cancellation of a Non-Credible Contingency Event: Yallourn - Rowville 7 220 kV line and Yallourn - Rowville 8 220 kV line in VIC1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: VIC1
Lines: Yallourn - Rowville 7 220 kV and Yallourn - Rowville 8 220 kV
Cancellation time: 25/06/2025 16:34
Constraint set(s) revoked:
V-ROYP78_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Refer AEMO Electricity Market Notice 127855
Auto-generated on behalf of Manager NEM Real Time Operations