PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 26/06/2025
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 127842 is cancelled at 1345 hrs 25/06/2025.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/06/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127841 is cancelled at 1345 hrs 25/06/2025.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - SA region 21/06/2025
Cancellation - AEMO Intervention Event - SA region 21/06/2025
Refer to Market Notice 127682
The AEMO Intervention Event and all associated directions are cancelled from 1400 hrs on 25/06/2025.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 127792
Direction is cancelled from: 1400 hrs 25/06/2025
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 26/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Periods:
[1.] From 1000 hrs 26/06/2025 to 1030 hrs 26/06/2025.
The forecast capacity reserve requirement is 430 MW.
The minimum capacity reserve available is 416 MW.
[2.] From 1430 hrs 26/06/2025 to 1600 hrs 26/06/2025.
The forecast capacity reserve requirement is 437 MW.
The minimum capacity reserve available is 373 MW.
[3.] From 1730 hrs 26/06/2025 to 2200 hrs 26/06/2025.
The forecast capacity reserve requirement is 435 MW.
The minimum capacity reserve available is 354 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 26/06/2025 to 1900 hrs 26/06/2025.
The forecast capacity reserve requirement is 1784 MW.
The minimum capacity reserve available is 1698 MW.
Manager NEM Real Time Operations
Cancellation: Reclassification of non-credible contingency event due to existence of widespread abnormal condition/s - SA region.
AEMO considers the occurrence of a non-credible contingency event due to the widespread abnormal conditions advised in AEMO Electricity Market Notice 127815 is no longer reasonably possible and accordingly its classification has reverted to non-credible.
Cancellation time: 1000 hrs 25/06/2025
Constraint set(s) revoked: I-VS_250
Manager NEM Real Time Operations
Cancellation of the reclassification of a Non-Credible Contingency Event: Para-Templers West and Magill-Torrens Island A 275kV lines in SA due to severe weather warning.
Cancellation of the reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.
AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any severe weather warning in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: SA
Lines: Para-Templers West and Magill-Torrens Island A 275kV lines
Cancellation time: 1000 hrs 25/06/2025
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 127749
Manager NEM Real Time Operations
Cancellation of the reclassification of a Non-Credible Contingency Event: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines in SA due to severe weather warning .
Cancellation of the reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.
AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any severe weather warning in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: SA
Lines: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines
Cancellation time: 1000 hrs 25/06/2025
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 127748
Manager NEM Real Time Operations