STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127994 has been updated to the following:
[1.] From 0000 hrs 10/07/2025 to 0100 hrs 10/07/2025.
The forecast capacity reserve requirement is 629 MW.
The minimum capacity reserve available is 596 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 09/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127993 has been updated to the following:
[1.] From 2100 hrs 09/07/2025 to 2359 hrs 09/07/2025.
The forecast capacity reserve requirement is 610 MW.
The minimum capacity reserve available is 498 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2200 hrs 08/07/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 127965
The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 1500 hrs 08/07/2025.
The direction update is issued at 1600 hrs 07/07/2025.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127990 has been updated at 1300 hrs 07/07/2025 to the following:
From 0000 hrs to 0100 hrs 10/07/2025.
The forecast capacity reserve requirement is 688 MW.
The minimum capacity reserve available is 659 MW.
AEMO is seeking a market response.
[AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 09/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127991 has been updated at 1300 hrs 07/07/2025 to the following:
1. From 0730 hrs to 2030 hrs 09/07/2025.
The forecast capacity reserve requirement is 767 MW.
The minimum capacity reserve available is 710 MW.
2. From 2100 hrs to 2359 hrs 09/07/2025.
The forecast capacity reserve requirement is 697 MW.
The minimum capacity reserve available is 566 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 09/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127989 has been updated at 1100 hrs 07/07/2025 to the following:
From 0600 hrs to 2359 hrs 09/07/2025.
The forecast capacity reserve requirement is 729 MW.
The minimum capacity reserve available is 566 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127988 has been updated at 0900 hrs 07/07/2025 to the following:
From 0000 hrs to 0200 hrs 10/07/2025.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 660 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 09/07/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127988 has been updated at 0900 hrs 07/07/2025 to the following:
1. From 0630 hrs to 2200 hrs 09/07/2025.
The forecast capacity reserve requirement is 747 MW.
The minimum capacity reserve available is 691 MW.
2. From 2230 hrs to 2359 hrs 09/07/2025.
The forecast capacity reserve requirement is 731 MW.
The minimum capacity reserve available is 667 MW.
AEMO is seeking a market response.