127754RESERVE NOTICE23/06/2025 10:36:22 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 30/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127726 has been updated to the following:

[1.] From 0400 hrs 30/06/2025 to 0730 hrs 30/06/2025.
The forecast capacity reserve requirement is 350 MW.
The minimum capacity reserve available is 0 MW.

[2.] From 0930 hrs 30/06/2025 to 1200 hrs 30/06/2025.
The forecast capacity reserve requirement is 223 MW.
The minimum capacity reserve available is 0 MW.

[3.] From 1530 hrs 30/06/2025 to 1730 hrs 30/06/2025.
The forecast capacity reserve requirement is 224 MW.
The minimum capacity reserve available is 0 MW.

[4.] From 2230 hrs 30/06/2025 to 0400 hrs 01/07/2025.
The forecast capacity reserve requirement is 244 MW.
The minimum capacity reserve available is 0 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
127753RESERVE NOTICE23/06/2025 09:53:46 PM

STPASA - Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 30/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR3 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period[s]:

[1.] From 0730 hrs 30/06/2025 to 0930 hrs 30/06/2025.
The maximum load (other than interruptible loads) forecast to be interrupted is 87 MW at 0800 hrs.

[2.] From 1700 hrs 30/06/2025 to 2300 hrs 30/06/2025.
The maximum load (other than interruptible loads) forecast to be interrupted is 112 MW at 1900 hrs.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
127741RESERVE NOTICE23/06/2025 03:01:39 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 01/07/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

From 0230 hrs to 0400 hrs 01/07/2025.
The forecast capacity reserve requirement is 460 MW.
The minimum capacity reserve available is 230 MW.

AEMO Operations
     
127739RESERVE NOTICE23/06/2025 03:01:19 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 30/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:

1. From 0700 hrs to 0730 hrs 30/06/2025.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 350 MW.

2. From 1000 hrs to 1030 hrs 30/06/2025.
The forecast capacity reserve requirement is 406 MW.
The minimum capacity reserve available is 334 MW.

3. From 1630 hrs to 1700 hrs 30/06/2025.
The forecast capacity reserve requirement is 459 MW.
The minimum capacity reserve available is 230 MW.

AEMO Operations
     
127738RESERVE NOTICE23/06/2025 03:00:49 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:

1. From 0630 hrs to 0800 hrs 26/06/2025.
The forecast capacity reserve requirement is 1859 MW.
The minimum capacity reserve available is 1515 MW.

2. From 1630 hrs to 2230 hrs 26/06/2025.
The forecast capacity reserve requirement is 1859 MW.
The minimum capacity reserve available is 1381 MW.

AEMO Operations
     
127728RESERVE NOTICE23/06/2025 02:23:51 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 01/07/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

From 0000 hrs to 0300 hrs 01/07/2025.
The forecast capacity reserve requirement is 230 MW.
The minimum capacity reserve available is 205 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
     
127726RESERVE NOTICE23/06/2025 02:24:01 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 30/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

1. From 0730 hrs to 1000 hrs 30/06/2025.
The forecast capacity reserve requirement is 230 MW.
The minimum capacity reserve available is 136 MW.

2. From 1700 hrs to 2359 hrs 30/06/2025.
The forecast capacity reserve requirement is 230 MW.
The minimum capacity reserve available is 109 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
     
127661RESERVE NOTICE18/06/2025 03:14:30 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 19/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127651 is cancelled at 1400 hrs 18/06/2025.

No LOR condition is currently forecast in the STPASA period.

AEMO Operations
     
127651RESERVE NOTICE17/06/2025 03:17:59 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 19/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:

1. From 0600 hrs to 0800 hrs 19/06/2025.
The forecast capacity reserve requirement is 1558 MW.
The minimum capacity reserve available is 1420 MW.

2. From 1630 hrs to 2300 hrs 19/06/2025.
The forecast capacity reserve requirement is 1558 MW.
The minimum capacity reserve available is 1487 MW.