Filter by category
Filter by Date
Cancellation - AEMO Intervention Event - SA region 05/06/2025
Cancellation - AEMO Intervention Event - SA region 05/06/2025
Refer to Market Notice 127388
The AEMO Intervention Event and all associated directions are cancelled from 1600 hrs on 06/06/2025.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 127407
Direction is cancelled from: 1600 hrs 06/06/2025
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 10/06/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127401 is cancelled at 1400 hrs 06/06/2025
AEMO Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 1900 hrs 06/06/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
AEMO estimates that, in the absence of sufficient market response by 1630 hrs 06/06/2025, AEMO may need to intervene by issuing a direction.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 127403
The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 1600 hrs 06/06/2025.
The direction update is issued at 1445 hrs 06/06/2025.
Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Thursday, 5 June 2025
NON-CONFORMANCE QLD1 Region Thursday, 5 June 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_2
Duration: 05/06/2025 19:30 to 05/06/2025 20:10
Amount: 23 MW
Constraint: NC-Q_MPP_2
Auto-generated on behalf of Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 127389
The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 7/06/2025.
The direction update is issued at 1600 hrs 5/06/2025.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 12/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
From 1800 hrs to 1830 hrs 12/06/2025.
The forecast capacity reserve requirement is 1618 MW.
The minimum capacity reserve available is 1595 MW.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 10/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
From 1730 hrs to 1830 hrs 10/06/2025.
The forecast capacity reserve requirement is 1502 MW.
The minimum capacity reserve available is 1301 MW.
AEMO Operations