128377MARKET INTERVENTION26/07/2025 04:52:58 PM

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

Refer to Market Notice 128318

The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 28/07/2025.

The direction update is issued at 1700 hrs 26/07/2025.

Manager NEM Real Time Operations
     
128376MARKET INTERVENTION26/07/2025 02:13:59 PM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 128373

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2230 hrs 26/07/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1700 hrs 26/07/2025, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
     
128373MARKET INTERVENTION26/07/2025 01:18:35 PM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2230 hrs 26/07/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
128359POWER SYSTEM EVENTS26/07/2025 08:58:23 AM

Update - Non-credible contingency event - NSW region - 26/07/2025

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - NSW region - 26/07/2025

Refer AEMO Electricity Market Notice 128353

At 0832 hrs the Canberra A 132kV Bus was returned to service.

The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations
     
128353POWER SYSTEM EVENTS26/07/2025 06:00:15 AM

Non-credible contingency event - NSW region - 26/07/2025

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - NSW region - 26/07/2025

At 0449 hrs the Canberra 132 kV A Bus and the Canberra to Latham A2 132 kV Line tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
     
128318MARKET INTERVENTION25/07/2025 05:00:06 PM

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

Refer to Market Notice 128311

The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 27/07/2025.

The direction update is issued at 1700 hrs 25/07/2025.

Manager NEM Real Time Operations
     
128317RESERVE NOTICE25/07/2025 03:07:49 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 28/07/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 128313 is cancelled at 1400 hrs 25/07/2025.

No LOR condition is currently forecast in the STPASA period.


AEMO Operations
     
128314MARKET INTERVENTION25/07/2025 12:36:03 PM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0400 hrs 26/07/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
128313RESERVE NOTICE25/07/2025 10:27:08 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 28/07/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

From 0730 hrs to 0900 hrs 28/07/2025.
The forecast capacity reserve requirement is 563 MW.
The minimum capacity reserve available is 536 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.