Filter by category
Filter by Date
Planned outage of Moorabool - Cressy No 1 500 kV line in the VIC region on 19/06/2025
The Moorabool - Cressy No 1 500 kV line in the Victoria (VIC) region is planned to be out of service from 0600 hrs to 1700 hrs on 19/06/2025.
A credible contingency event during this planned outage could cause synchronous separation of the South Australia (SA) region from the rest of the NEM.
During this planned outage:
* Power transfer will be restricted across the VIC - SA interconnector (Heywood interconnector); and
* Post contingent FCAS will be sourced within SA following Separation event.
Refer AEMO Network Outage Schedule (NOS) for further details.
AEMO Operations
Cancellation - AEMO Intervention Event - SA region 15/06/2025
Cancellation - AEMO Intervention Event - SA region 15/06/2025
Refer to Market Notice 127557
The AEMO Intervention Event and all associated directions are cancelled from 1500 hrs on 16/06/2025.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 127558
Direction is cancelled from: 1500 hrs 16/06/2025
Manager NEM Real Time Operations
NON-CONFORMANCE Region VIC1 Monday, 16 June 2025
NON-CONFORMANCE VIC1 Region Monday, 16 June 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MOKOSF1
Duration: 16/06/2025 11:20 to 16/06/2025 11:30
Amount: 30 MW
Constraint: NC-V_MOKOSF1
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region VIC1 Monday, 16 June 2025
NON-CONFORMANCE VIC1 Region Monday, 16 June 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MOKOSF1
Duration: 16/06/2025 10:15 to 16/06/2025 10:45
Amount: 12 MW
Constraint: NC-V_MOKOSF1
Auto-generated on behalf of Manager NEM Real Time Operations
Cancellation - Possible intervention to manage power system security in South Australia (SA) region 16/06/2025
Cancellation - Possible intervention to manage power system security in South Australia (SA) region 16/06/2025
Refer Market Notice 127570
AEMO no longer foresees a possible requirement for intervention to manage power system security in SA region. The advice of possible intervention is cancelled from 0840 hrs 16/06/2025.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the QLD region - 16/06/2025
Cancellation of Actual (LOR1) condition in the QLD region - 16/06/2025
The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.127572 is cancelled at 0715 hrs 16/06/2025.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 16/06/2025
Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 16/06/2025
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 0630 hrs.
The Actual LOR1 condition is forecast to exist until 0730 hrs
The capacity reserve requirement is 700 MW
The minimum capacity reserve available is 638 MW
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2230 hrs 16/06/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations