Market Notices

127505RESERVE NOTICE11/06/2025 07:43:29 PM

Cancellation of the Actual Lack Of Reserve Level 1 (LOR1) condition in the QLD Region on 11/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Actual LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 127504 is cancelled at 1945 hrs 11/06/2025.

Manager NEM Real Time Operations
     
127504RESERVE NOTICE11/06/2025 07:12:10 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 11/06/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 11/06/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1900 hrs.
The Actual LOR1 condition is forecast to exist until 1930 hrs

The capacity reserve requirement is 730 MW
The minimum capacity reserve available is 693 MW

Manager NEM Real Time Operations
     
127473RECLASSIFY CONTINGENCY07/06/2025 11:47:43 PM

Cancellation of the reclassification of a Non-Credible Contingency Event: Para-Templers West and Magill-Torrens Island A 275kV lines in SA due to severe weather warning.

AEMO ELECTRICITY MARKET NOTICE.

Cancellation of the reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.
AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any severe weather warning in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: SA
Lines: Para-Templers West and Magill-Torrens Island A 275kV lines
Cancellation time: 2345 hrs 7/06/2025
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 127419

Manager NEM Real Time Operations
     
127472RECLASSIFY CONTINGENCY07/06/2025 11:47:22 PM

Cancellation of the reclassification of a Non-Credible Contingency Event: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines in SA due to severe weather warning .

AEMO ELECTRICITY MARKET NOTICE.

Cancellation of the reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.
AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any severe weather warning in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: SA
Lines: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines
Cancellation time: 2345 hrs 7/06/2025
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 127418

Manager NEM Real Time Operations
     
127471RECLASSIFY CONTINGENCY07/06/2025 11:47:12 PM

Cancellation: Reclassification of non-credible contingency event due to existence of widespread abnormal conditions - SA region.

AEMO ELECTRICITY MARKET NOTICE.

AEMO considers the occurrence of a non-credible contingency event due to the widespread abnormal conditions advised in AEMO Electricity Market Notice 127450 is no longer reasonably possible and accordingly its classification has reverted to non-credible.

Cancellation time: 2345 hrs 7/06/2025

Constraint set(s) revoked:
I-VS_250

Manager NEM Real Time Operations
     
127470PRICES UNCHANGED07/06/2025 04:30:20 PM

[EventId:202506071610_confirmed] Prices for interval 07-Jun-2025 16:10 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1630 hrs on 7 June 2025

PRICES ARE NOW CONFIRMED for trading interval 07-Jun-2025 16:10.

In accordance with Market Notice 127460 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
127469PRICES UNCHANGED07/06/2025 04:30:19 PM

[EventId:202506071630_confirmed] Prices for interval 07-Jun-2025 16:30 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1630 hrs on 7 June 2025

PRICES ARE NOW CONFIRMED for trading interval 07-Jun-2025 16:30.

In accordance with Market Notice 127464 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
127468PRICES UNCHANGED07/06/2025 04:30:20 PM

[EventId:202506071625_confirmed] Prices for interval 07-Jun-2025 16:25 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1630 hrs on 7 June 2025

PRICES ARE NOW CONFIRMED for trading interval 07-Jun-2025 16:25.

In accordance with Market Notice 127463 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
127467PRICES UNCHANGED07/06/2025 04:30:19 PM

[EventId:202506071620_confirmed] Prices for interval 07-Jun-2025 16:20 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1630 hrs on 7 June 2025

PRICES ARE NOW CONFIRMED for trading interval 07-Jun-2025 16:20.

In accordance with Market Notice 127462 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.