127561RESERVE NOTICE15/06/2025 02:33:35 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 127556 has been updated at 1415 hrs 15/06/2025 to the following:


[1.] From 1100 hrs 17/06/2025 to 1130 hrs 17/06/2025.
The forecast capacity reserve requirement is 765 MW.
The minimum capacity reserve available is 696 MW.

[2.] From 1400 hrs 17/06/2025 to 1430 hrs 17/06/2025.
The forecast capacity reserve requirement is 749 MW.
The minimum capacity reserve available is 629 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
127559RESERVE NOTICE15/06/2025 02:25:14 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127546 has been updated at 1415 hrs 15/06/2025 to the following:

[1.] From 0730 hrs 17/06/2025 to 1030 hrs 17/06/2025.
The forecast capacity reserve requirement is 554 MW.
The minimum capacity reserve available is 414 MW.

[2.] From 1500 hrs 17/06/2025 to 1800 hrs 17/06/2025.
The forecast capacity reserve requirement is 418 MW.
The minimum capacity reserve available is 383 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
127556RESERVE NOTICE15/06/2025 01:17:21 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127544 has been updated at 1315 hrs 15/06/2025 to the following:


[1.] From 1100 hrs 17/06/2025 to 1130 hrs 17/06/2025.
The forecast capacity reserve requirement is 737 MW.
The minimum capacity reserve available is 688 MW.

[2.] From 1400 hrs 17/06/2025 to 1430 hrs 17/06/2025.
The forecast capacity reserve requirement is 747 MW.
The minimum capacity reserve available is 620 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
127554MARKET INTERVENTION15/06/2025 01:18:52 PM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 127551

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2300 hrs 15/06/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1600 hrs 15/06/2025, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
     
127551MARKET INTERVENTION15/06/2025 06:53:11 AM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2300 hrs 15/06/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
127550MARKET INTERVENTION15/06/2025 04:00:22 AM

Cancellation - AEMO Intervention Event - SA region 12/06/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - SA region 12/06/2025

Refer to Market Notice 127518

The AEMO Intervention Event and all associated directions are cancelled from 0400 hrs on 15/06/2025.


Manager NEM Real Time Operations
     
127549MARKET INTERVENTION15/06/2025 04:00:09 AM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer to Market Notice 127535

Direction is cancelled from: 0400 hrs 15/06/2025

Manager NEM Real Time Operations
     
127546RESERVE NOTICE14/06/2025 10:58:19 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127545 has been updated at 2250 hrs 14/06/2025 to the following:

[1.] From 0600 hrs 17/06/2025 to 1800 hrs 17/06/2025.
The forecast capacity reserve requirement is 529 MW.
The minimum capacity reserve available is 392 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
127545RESERVE NOTICE14/06/2025 08:50:40 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127541 has been updated at 2045 hrs 14/06/2025 to the following:


[1.] From 0600 hrs 17/06/2025 to 1000 hrs 17/06/2025.
The forecast capacity reserve requirement is 584 MW.
The minimum capacity reserve available is 503 MW.

[2.] From 1530 hrs 17/06/2025 to 1600 hrs 17/06/2025.
The forecast capacity reserve requirement is 535 MW.
The minimum capacity reserve available is 513 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
X