Filter by category
Filter by Date
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 18/06/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1730 hrs to 1900 hrs 18/06/2025.
The forecast capacity reserve requirement is 1047 MW.
The minimum capacity reserve available is 957 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 18/06/2025
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 127604 is cancelled at 1700 hrs 16/06/2025.
No LOR2 condition is currently forecast in the STPASA period.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 18/06/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
1. From 0700 hrs to 0830 hrs 18/06/2025.
The forecast capacity reserve requirement is 1086 MW.
The minimum capacity reserve available is 896 MW.
2. From 1630 hrs to 1700 hrs 18/06/2025.
The forecast capacity reserve requirement is 1128 MW.
The minimum capacity reserve available is 922 MW.
3. From 1730 hrs to 1900 hrs 18/06/2025.
The forecast capacity reserve requirement is 1167 MW.
The minimum capacity reserve available is 1135 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
Cancellation - AEMO Intervention Event - SA region 15/06/2025
Cancellation - AEMO Intervention Event - SA region 15/06/2025
Refer to Market Notice 127557
The AEMO Intervention Event and all associated directions are cancelled from 1500 hrs on 16/06/2025.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 127558
Direction is cancelled from: 1500 hrs 16/06/2025
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127598 is cancelled at 1410 hrs 16/06/2025.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Period:
[1.] From 1730 hrs 17/06/2025 to 1800 hrs 17/06/2025.
The forecast capacity reserve requirement is 292 MW.
The minimum capacity reserve available is 230 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/06/2025
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 127577 is cancelled at 1200 hrs 16/06/2025.
No LOR2 condition is currently forecast in the STPASA period.
AEMO Operations
[EventId:202506161145_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 16 June 2025 11:45
Issued by Australian Energy Market Operator Ltd at 1145 hrs on 16 June 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 16 June 2025.
Refer to market notice: 127594
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1145 hrs on 16 June 2025.
This is an AEMO autogenerated Market Notice.