122278RECLASSIFY CONTINGENCY19/12/2024 04:29:20 PM

Cancellation of a Non-Credible Contingency Event: Strathmore - Clare South No.7208 132 kV line and Strathmore - Clare South tee King Creek No.7128 132 kV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: QLD1

Lines: Strathmore - Clare South No.7208 132 kV and Strathmore - Clare South tee King Creek No.7128 132 kV

Cancellation time: 19/12/2024 16:29

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 122273

Auto-generated on behalf of Manager NEM Real Time Operations
     
122275MINIMUM SYSTEM LOAD19/12/2024 03:51:33 PM

Forecast Minimum System Load (MSL2) condition in the VIC region on 22/12/2024

AEMO ELECTRICITY MARKET NOTICE
AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC region on 22/12/2024.

Minimum System Load (MSL) conditions are forecast when regional demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
o MSL1 - 1790 MW
o MSL2 - 1290 MW
o MSL3 - 790 MW

The regional demand is forecast to be below the MSL2 threshold for the following period:

From 1230 hrs 22/12/2024 to 1300 hrs 22/12/2024. Minimum regional demand is forecast to be 1289 MW at 1300 hrs.

Forecast regional demand (DEMAND50) is published in Short Term and Pre-Dispatch PASA region solution reports available on Market Data NEMWEB: https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/data-nem/market-data-nemweb .

AEMO Operations
     
122273RECLASSIFY CONTINGENCY19/12/2024 03:28:30 PM

Reclassification of a Non-Credible Contingency Event: Strathmore - Clare South No.7208 132 kV line and Strathmore - Clare South tee King Creek No.7128 132 kV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Strathmore - Clare South No.7208 132 kV and Strathmore - Clare South tee King Creek No.7128 132 kV

Duration: 19/12/2024 15:28 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
     
122271MINIMUM SYSTEM LOAD19/12/2024 03:05:12 PM

Forecast Minimum System Load (MSL1) condition in the VIC region on 22/12/2024

AEMO ELECTRICITY MARKET NOTICE
Update to Market Notice 122195 - AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC region on 22/12/2024.

Minimum System Load (MSL) conditions are forecast when regional demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
o MSL1 - 1790 MW
o MSL2 - 1290 MW
o MSL3 - 790 MW

The regional demand is forecast to be below the MSL1 threshold for the following period:

From 1030 hrs 22/12/2024 to 1500 hrs 22/12/2024. Minimum regional demand is forecast to be 1292 MW at 1300 hrs.

Forecast regional demand (DEMAND50) is published in Short Term and Pre-Dispatch PASA region solution reports available on Market Data NEMWEB: https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/data-nem/market-data-nemweb .

AEMO Operations
     
122269PRICES UNCHANGED19/12/2024 02:07:26 PM

[EventId:202412191340_confirmed] Prices for interval 19-Dec-2024 13:40 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1400 hrs on 19 December 2024

PRICES ARE NOW CONFIRMED for trading interval 19-Dec-2024 13:40.

In accordance with Market Notice 122254 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
122268PRICES UNCHANGED19/12/2024 02:06:18 PM

[EventId:202412191400_confirmed] Prices for interval 19-Dec-2024 14:00 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1400 hrs on 19 December 2024

PRICES ARE NOW CONFIRMED for trading interval 19-Dec-2024 14:00.

In accordance with Market Notice 122263 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
122267PRICES UNCHANGED19/12/2024 02:04:22 PM

[EventId:202412191355_confirmed] Prices for interval 19-Dec-2024 13:55 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1400 hrs on 19 December 2024

PRICES ARE NOW CONFIRMED for trading interval 19-Dec-2024 13:55.

In accordance with Market Notice 122261 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
122266PRICES UNCHANGED19/12/2024 02:03:17 PM

[EventId:202412191350_confirmed] Prices for interval 19-Dec-2024 13:50 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1400 hrs on 19 December 2024

PRICES ARE NOW CONFIRMED for trading interval 19-Dec-2024 13:50.

In accordance with Market Notice 122256 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
122265PRICES UNCHANGED19/12/2024 02:01:58 PM

[EventId:202412191345_confirmed] Prices for interval 19-Dec-2024 13:45 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1400 hrs on 19 December 2024

PRICES ARE NOW CONFIRMED for trading interval 19-Dec-2024 13:45.

In accordance with Market Notice 122255 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     