Filter by category
Filter by Date
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/09/2024
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 118175 is cancelled at 2230 hrs 07/09/2024.
No LOR2 condition is currently forecast in the STPASA period.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/09/2024
AEMO ELECTRICITY MARKET NOTICE
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
[1.] From 1830 hrs 10/09/2024 to 1900 hrs 10/09/2024.
The forecast capacity reserve requirement is 415 MW.
The minimum capacity reserve available is 385 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Update - Non-credible contingency event - VIC region - 06/09/2024
Update - Non-credible contingency event - VIC region - 06/09/2024
Refer AEMO Electricity Market Notice 118166
At 2005 hrs the Loy Yang PS No. 4 500 kV bus was returned to service.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - VIC region - 06/09/2024
Non-credible contingency event - VIC region - 06/09/2024
At 1222 hrs the Loy Yang PS No. 4 500 kV bus tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
[EventId:202409050755_review] Prices for interval 05-Sep-2024 07:55 are subject to review
Issued by Australian Energy Market Operator Ltd at 0750 hrs on 5 September 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 05-Sep-2024 07:55.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202409050750_review] Prices for interval 05-Sep-2024 07:50 are subject to review
Issued by Australian Energy Market Operator Ltd at 0745 hrs on 5 September 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 05-Sep-2024 07:50.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202409050745_review] Prices for interval 05-Sep-2024 07:45 are subject to review
Issued by Australian Energy Market Operator Ltd at 0740 hrs on 5 September 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 05-Sep-2024 07:45.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202409050740_review] Prices for interval 05-Sep-2024 07:40 are subject to review
Issued by Australian Energy Market Operator Ltd at 0735 hrs on 5 September 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 05-Sep-2024 07:40.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202409050735_review] Prices for interval 05-Sep-2024 07:35 are subject to review
Issued by Australian Energy Market Operator Ltd at 0730 hrs on 5 September 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 05-Sep-2024 07:35.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.