118858MARKET INTERVENTION13/10/2024 04:02:43 PM

Direction - SA region 13/10/2024 to Synergen Power Pty Limited - MINTARO MINTARO GAS

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region 13/10/2024 to Synergen Power Pty Limited - MINTARO MINTARO GAS

Refer to Market Notice 118857


In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Synergen Power Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: Synergen Power Pty Limited - MINTARO MINTARO GAS at 1600 hrs 13/10/2024
Type of resource: generating unit
Required actions: Synchronise and follow dispatch targets at 0830 hrs 14/10/2024
Services provided: Voltage Control
Circumstances necessitating the Direction:Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 0400 hrs 15/10/2024

Synergen Power Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
118857MARKET INTERVENTION13/10/2024 02:41:31 PM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 118856

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0900 hrs 14/10/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1600 hrs 13/10/2024, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
118856MARKET INTERVENTION13/10/2024 02:27:43 PM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0900 hrs 14/10/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
118855MARKET INTERVENTION13/10/2024 03:31:37 PM

Cancellation - AEMO Intervention Event - SA region 10/10/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - SA region 10/10/2024

Refer to Market Notice 118763

The AEMO Intervention Event and all associated directions are cancelled from 1530 hrs on 13/10/2024.


Manager NEM Real Time Operations
118854MARKET INTERVENTION13/10/2024 03:29:58 PM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer to Market Notice 118811

Direction is cancelled from: 1530 hrs 13/10/2024

Manager NEM Real Time Operations
118853MARKET INTERVENTION13/10/2024 02:58:06 PM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer to Market Notice 118850

Direction is cancelled from: 1500 hrs 13/10/2024

Manager NEM Real Time Operations
118852SETTLEMENTS RESIDUE13/10/2024 01:30:32 PM

[EventId:202410131330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 13 October 2024 13:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1330 hrs on 13 October 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 13 October 2024.

Refer to market notice: 118839

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 13 October 2024.

This is an AEMO autogenerated Market Notice.
118850MARKET INTERVENTION13/10/2024 12:01:09 PM

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer AEMO Electricity Market Notice 118830

The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 1500 hrs 13/10/2024.

The direction update is issued at 1200 hrs 13/10/2024.

Manager NEM Real Time Operations
118839SETTLEMENTS RESIDUE13/10/2024 10:46:46 AM

[EventId:202410131045_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 13 October 2024 10:45

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1045 hrs on 13 October 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 13 October 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1045 hrs on 13 October 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.